brad465
Veteran Member
What lines have the strongest case for increasing the number of signals along it, without necessarily having any other changes to the infrastructure?
Two I can think of are:
- Castle Cary-Cogload Jct: currently 2-aspect and has a very long block between just west of Castle Cary and Somerton. It's not uncommon in the down direction for a fast train to catchup to a semi-fast ahead of it, even if they are still technically 7-8 minutes ahead. Making this 3-aspect, or at the very least adding another one or two blocks, would increase capacity and improve resilience.
- Maidstone East line: currently 3-aspect, but the blocks are notably long, possibly because it's a core freight route with no freight speed differentials. This is a particular problem in the peaks (where 4tph run at uneven intervals) and/or when a freight train traverses at certain times. I think this could do with some 4-aspect sections, especially around Otford and Maidstone East, and/or shrinking the signal blocks and having something like a 50-55mph freight limit (they hardly reach the 70-80mph limit anyway), similar to Swanley-Otford.
Two I can think of are:
- Castle Cary-Cogload Jct: currently 2-aspect and has a very long block between just west of Castle Cary and Somerton. It's not uncommon in the down direction for a fast train to catchup to a semi-fast ahead of it, even if they are still technically 7-8 minutes ahead. Making this 3-aspect, or at the very least adding another one or two blocks, would increase capacity and improve resilience.
- Maidstone East line: currently 3-aspect, but the blocks are notably long, possibly because it's a core freight route with no freight speed differentials. This is a particular problem in the peaks (where 4tph run at uneven intervals) and/or when a freight train traverses at certain times. I think this could do with some 4-aspect sections, especially around Otford and Maidstone East, and/or shrinking the signal blocks and having something like a 50-55mph freight limit (they hardly reach the 70-80mph limit anyway), similar to Swanley-Otford.