• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Lines and services already suitable for battery train operation

Status
Not open for further replies.

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,356
Location
Nottingham
Alstom has battery trains (BEMU) in passenger service in Germany, covering 50mi/80km off the wires, which is also the "guaranteed range" of the Stadler Flirt AKKU. (See links in the quote below).

Assuming a BEMU with this range in the UK, what lines or services could be served by BEMUs with no further electrification? And also after those electrification projects already committed? (e.g. after MML, TRU, Lostock-Wigan).

So we're looking for branch lines of 25 miles or less; or unelectrified segments up to 50miles, but with electrification at each end. Let's assume also that the electrified section of the route must be at least as long as the unelectrified length, so the trains don't have to wait under the wires to recharge.

This article talks about 50miles off the wires: https://www.railtech.com/infrastruc...pply-dublin-with-battery-and-electric-trains/
"This concept will enable the BEMU fleet to run more than 50 miles outside the electrified network on battery power and will be the first modern battery fleet in Ireland."

This one mentions 50 miles too:
"In February 2020, the transport company for central Saxony, VMS GmbH and Alstom signed a EUR 100 million contract for the supply of 11 three-car Coradia Continental battery-electric trains. To bridge the 80 km of non-electrified line between the cities of Chemnitz and Leipzig the authority requested a battery-electric (BEMU) fleet expected to enter service in 2023."

Similar to the Stadler FLIRT Akku which has 80 kilometres guaranteed by the company, according to this: https://www.railtech.com/rolling-st...kku-sets-world-record-for-battery-only-range/
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,967
Location
Surrey
North Downs - perfect gaps with electrification at either end (albeit 3rd rail)
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,356
Location
Nottingham
North Downs - perfect gaps with electrification at either end (albeit 3rd rail)
I'm sure a third rail BEMU would be feasible. Another candidate in third rail land is the Uckfield branch.

In the North, there are the Buxton and Windermere branches. And after MML electrification, there's Matlock-Newark Castle, and Crewe-Nottingham.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,408
Location
East coast of Yorkshire
York to Leeds via Harrogate, just under 40 miles, wires either end, would the 20-30 mins layover at each end plus the short distance of wires into York and Leeds be enough?
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,631
Location
Torbay
North Downs - perfect gaps with electrification at either end (albeit 3rd rail)
3rd rail BEMUs should be simpler and lighter than those with 25kV OHLE capability, because they don't need the heavy step down transformer and a pantograph well on the roof.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,356
Location
Nottingham
York to Leeds via Harrogate, just under 40 miles, wires either end, would the 20-30 mins layover at each end plus the short distance of wires into York and Leeds be enough?
That looks interesting. When I suggested as much distance under the wires as unelectrified, I was guessing. I wonder what recharging rates would be possible? One of the reasons I wanted to avoid recharging during layovers is that concetrating all that current into a single point on the contact wire will/could cause problems with local heating.

I guess you could always extend the wiring at each end for a few miles, at relatively little cost to allow recharging on the move.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,408
Location
East coast of Yorkshire
That looks interesting. When I suggested as much distance under the wires as unelectrified, I was guessing. I wonder what recharging rates would be possible? One of the reasons I wanted to avoid recharging during layovers is that concetrating all that current into a single point on the contact wire will/could cause problems with local heating.

I guess you could always extend the wiring at each end for a few miles, at relatively little cost to allow recharging on the move.
I think on that route you would have to recharge during the lay over, but could you have a short section of conductor bar with plenty of contact area at the layover points (but then you loose platform flexibility...), maybe some form of shore supply would be better, perhaps at the voltage used to actually recharge the batteries, as plugging and unplugging 25kv isnt going to work easily/safely.

The solution you have identified, extend the wires at relativley little cost, is the main reason why we are where we are in the UK, we cannot deliver electrification on time or to budget anymore. One has to say that for any route where the service is more than hourly each way then it should be electrified, but its not going to happen. Carting big batteries around feels like a 'make do and mend' solution.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,356
Location
Nottingham
extend the wires at relativley little cost,
Yes, but my thinking is you could extend at each end at least until the first overbridge. That would be much less per mile than a full electrification with all the bridge raising and other civil engineering that would entail. And you get 40 miles of electric railway for say 5-10 miles of new OHLE. So relatively little cost compared to full electrification, which is what I meant.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,977
A good rule of thumb is that a battery train needs as much time on the juice as off it. There’s loads of possibilities.

However, don’t forget that the power drawn will be roughly the same as if the line was fully electrified. (Charging losses broadly similar to power system losses). Therefore you will still need more power supply, if not more contact system.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,356
Location
Nottingham
There’s loads of possibilities.
I'm sure there are. What I'm trying to do with this thread is to try get a feel for how much of the whole network can be "electrified" this way. I understand that about 50% of track km are currently electrified, accounting for ~80% of passenger km. How will those figures change with battery technology? And how many BEMU's should GBR be ordering now?
 

ld0595

Member
Joined
1 Aug 2014
Messages
672
Location
Glasgow
I'd say Maryhill line. Relatively short and electrified at the Glasgow end. Can't imagine it would be too difficult to electrify the third platform at Anniesland.
 
Status
Not open for further replies.

Top