ABB125
Established Member
When the track was renewed recently in the area around Ashchurch station, was the line speed increased? I'm sure it used to be 90mph, but now I've seen a sign saying 100mph. Is this correct?
When the track was renewed recently in the area around Ashchurch station, was the line speed increased? I'm sure it used to be 90mph, but now I've seen a sign saying 100mph. Is this correct?
Was a fair chunk planned to get raised to 100 down there, majority scaled back due to costs and the level crossings. Not enough bang for your buck. 125mph would be even more expensive.
Possibly, I wouldn't expect 125 though. The crossings would go as part of the eventual closure of Gloucester.