I was reading in the Jan 2011 issue of Modern railways. There was an excellent article about the Ebbw Vale line. They were talking about what plans that were being considered for the next few years. Amongst these was the extension of the dynamic loop northwards from Cross Keys to Aberbeeg, to where the new line to Abertillery would diverge. Plus addition double tracking would be needed at the Newport end of the line if the service was increased up to 4tph.
If my memory serves me right, orginally the double track section was intened to be at least 3 times longer than it was built as, plus stations at Aberbeeg, Crumlin & Pye Courner, all now under serious consdieration, were discounted due to cost. Also the platforms were only built for 4 car trains, it mentioned that it is likely that they will all have to be extended to 6 car very soon, due to the demand.
It seems to me that we have been here before, for example the Aberdare branch was reopened on the cheap. It was planned to build the platforms on it for 4 car, but to save money they were only built as 2 car. They have needed to be extended twice up to 4 car and now I believe up to 6 car, again due to demand.
Also further platform extensions and re-double tracking has taken place over the Cardiff Valeys lines over the last few years.
Do our elected representatives ever listen to those with experience. They 'save money' when thing are built, then they have to spend even more to upgrade the facilities up to where they should have been built to in the first place. Cost often 4/5 times more than the orginal savings.
What do you all think.
If my memory serves me right, orginally the double track section was intened to be at least 3 times longer than it was built as, plus stations at Aberbeeg, Crumlin & Pye Courner, all now under serious consdieration, were discounted due to cost. Also the platforms were only built for 4 car trains, it mentioned that it is likely that they will all have to be extended to 6 car very soon, due to the demand.
It seems to me that we have been here before, for example the Aberdare branch was reopened on the cheap. It was planned to build the platforms on it for 4 car, but to save money they were only built as 2 car. They have needed to be extended twice up to 4 car and now I believe up to 6 car, again due to demand.
Also further platform extensions and re-double tracking has taken place over the Cardiff Valeys lines over the last few years.
Do our elected representatives ever listen to those with experience. They 'save money' when thing are built, then they have to spend even more to upgrade the facilities up to where they should have been built to in the first place. Cost often 4/5 times more than the orginal savings.
What do you all think.