Lime street approach

Status
Not open for further replies.

stockport1

Member
Joined
5 Apr 2011
Messages
169
There seem to be trackside lights going up on the approach to lime street/edge hill and in the tunnel to lime street.

Are they infact lights?
Are these permanent?

thx
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
There seem to be trackside lights going up on the approach to lime street/edge hill and in the tunnel to lime street.

Are they infact lights?
Are these permanent?

thx
The whole of the approach to lime street is getting remodelled,the crossovers which are currently in the tunnels will be shifted further south towards edge hill.This is because of the damage and wear and tear the equipment is receiving inside the tunnels,due to constant water dripping.
Also moving the track will allow easier maintainance to take place
 

stockport1

Member
Joined
5 Apr 2011
Messages
169
Are they going to remove the electrified flyover to nowhere and make the turn towards Liv Airport 4 track and not quite as tight while they are at it :D :D.

That is a 4 track section of railway that might as well not be 4 track due to the narrowing at edge hill end and Runcorn end.
ideally you would want runcorn and beyond using the tracks for platforms 3+4 at [stn]LPY[/stn] so the manchester bound trains could have platforms 1 +2 at [stn]LPY[/stn]. but because of the layout at the ends of this strech it would mean crossing all lines to do so :((


What a waste
 
Last edited by a moderator:

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
The whole of the approach to lime street is getting remodelled,the crossovers which are currently in the tunnels will be shifted further south towards edge hill.This is because of the damage and wear and tear the equipment is receiving inside the tunnels,due to constant water dripping.
Also moving the track will allow easier maintainance to take place

Have you got a source for this? You are the same person who is claiming that Northern are getting Class 350s from London Midland in another thread afterall.

The lights are for night time inspections - and are not limited to the places mentioned in this thread. They are also going in at Allerton West junction, which clearly has nothing to do with Lime Street approach.
 

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
my source is a senior network rail manager,i don't know when lime street is getting renewed, only that it is,and as above the crossovers moved towards edge hill.
I will try and put up the design for it.
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
A bit like your 'friend in high places' at London Midland? All sounds a bit suspicious I'm afraid. Moving the cross overs towards at Edge Hill with lower capacity.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,557
The whole of the approach to lime street is getting remodelled,the crossovers which are currently in the tunnels will be shifted further south towards edge hill.This is because of the damage and wear and tear the equipment is receiving inside the tunnels,due to constant water dripping.
Also moving the track will allow easier maintainance to take place


I sign Lime Street and have heard nothing of a remodelling scheme except for this. Normally these schemes are known about long before work begins and not when lighting appears. I can't see how moving the pointwork towards Edge hill would be beneficial as they are already mostly in the open so they get wet each time it rains. The water dripping in the tunnels doesn't fall onto pointwork its in areas of plain line (near Lime Streets first gantry). There is a slow line crossover near Edge Hill but again there doesn't appear to be water either on the ground or walls. Nothing noted in the notices about a remodelling scheme either.
 

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
A bit like your 'friend in high places' at London Midland? All sounds a bit suspicious I'm afraid. Moving the cross overs towards at Edge Hill with lower capacity.
I only put threads on the forum if im told about them, I don't make items up.
My source's have never let me down yet.
The lights installed at lime street might be for maintainance,walkways etc but the crossovers will be moved.
You are entitled to your opinion just like me.
 

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
The whole of liverpool lime street approach will be remodelled after the electrification of lancashire triangle somewhere near 2016-2018.Network rail are looking at the designs now and will def go ahead
 

First class

Established Member
Joined
9 Aug 2008
Messages
2,731
The whole of liverpool lime street approach will be remodelled after the electrification of lancashire triangle somewhere near 2016-2018.Network rail are looking at the designs now and will def go ahead

You sure you didn't get that from the RUS?

Lime St is resignalled in 2018. I believe getting merged with Edge Hill but that is far from certain. Merseyrail in 2020, (so possibly Allerton/Hunts Cross and Hooton/Chester merger).
 

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
It will defo go ahead after the wire go's up, it will tie in with the resignalling i assume, i might be able to get hold of a design or confirmation of what work will take place
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Are Northern still getting 350s from London Midland too? :roll:

First Class, Lime Street box is due to be closed before the resignalling (2015), and moved to the regional control centre, so I'm not sure where the merging with Edge Hill comes from?
 

- Cal -

Member
Joined
22 Oct 2009
Messages
44
I sign Lime Street and have heard nothing of a remodelling scheme except for this. Normally these schemes are known about long before work begins and not when lighting appears. I can't see how moving the pointwork towards Edge hill would be beneficial as they are already mostly in the open so they get wet each time it rains. The water dripping in the tunnels doesn't fall onto pointwork its in areas of plain line (near Lime Streets first gantry). There is a slow line crossover near Edge Hill but again there doesn't appear to be water either on the ground or walls. Nothing noted in the notices about a remodelling scheme either.

I second that, I also sign lime st, have noticed the led lights on the tunnel wall but have also not seen anything in the notices as to what is going on.
 

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
Don't think just because you sign the roads in 2011 that it will not change in 5/6 years time.
Trust me i will come back to this thread when it happens.
 

First class

Established Member
Joined
9 Aug 2008
Messages
2,731
Are Northern still getting 350s from London Midland too? :roll:

First Class, Lime Street box is due to be closed before the resignalling (2015), and moved to the regional control centre, so I'm not sure where the merging with Edge Hill comes from?

That's what it will be. Knew something was happening with Lime St & Edge Hill!

I was under the impression 2018 was the resignalling though as it was assumed Merseyrail would be resignalled soon afterwards.
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Yes, sorry, closure in 2015, resignalling at a later date. I didn't phrase it very well.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,557
Don't think just because you sign the roads in 2011 that it will not change in 5/6 years time.
Trust me i will come back to this thread when it happens.

Nobody is doubting or denying that the railway may change. My comment about signing the route was to point out that there is nothing in section B of the notices I recieve or mentioned anywhere else about remodelling which you seemed to give as an answer to why lighting had been installed. Now you say its 6 years away, no wonder doubt and confusion came about.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,398
Location
A typical commuter-belt part of north-west England
Nobody is doubting or denying that the railway may change. My comment about signing the route was to point out that there is nothing in section B of the notices I receive or mentioned anywhere else about remodelling which you seemed to give as an answer to why lighting had been installed. Now you say its 6 years away, no wonder doubt and confusion came about.

You put this so well, from being involved within the industry. This thread seemed to becoming less and less credible from comments made during thread progression, which could have been clarified much sooner.
 

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
My fault for getting in front of myself,Lights are for maintainance,walkways etc.
I was only saying that the whole of lime street approach is getting remodelled but that is in years time,and the present lights do not have anything to do with that,sorry for ther confussion
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
My fault for getting in front of myself,Lights are for maintainance,walkways etc.
I was only saying that the whole of lime street approach is getting remodelled but that is in years time,and the present lights do not have anything to do with that,sorry for ther confussion

I told you that in post #4 in this thread - don't pretend that this is new info and that you are correcting yourself.
 

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
I'm sorry who are you?
I was stating that lime street will be done,and maybe i went a bit to far as regard to the lights was something to do with that.
And if i want to correct myself i will,you or nobody else tells me what i do or type
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
I'm sorry who are you?
I was stating that lime street will be done,and maybe i went a bit to far as regard to the lights was something to do with that.
And if i want to correct myself i will,you or nobody else tells me what i do or type

Forgive me, I'm merely putting things into perspective. The thread asks what the lights are, you tell people that they are because they are changing Lime Street approaches. I (and others) point out that you are wrong - and on the next page of the thread you repeat the reason I had already given, showing that you were wrong.

Sorry if it didn't come across like that to you.
 

ole man

Member
Joined
6 Jul 2011
Messages
739
Location
LEC5
you are correct in saying the lights are not for the remodelling,i got carried away with myself.
I might start a new thread saying that liverpool lime street will get remodelled,then there will be no confussion
 