• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Level Crossings

Step3 Star

Member
Joined
19 Dec 2019
Messages
42
Location
Cider Country
What is the stipulation for a Level Crossing to be included in the Sectional Appendix Table A Diagrams??

I've noticed recently when a Footpath Crossing has been upgraded and had the red and green OMSL (overlay miniature stop lights) unit installed but has not been included in the Sectional Appendix Table A Diagrams.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,599
Location
Nottingham
Are you looking at the downloadable PDFs? The online version (NESA) is more up to date but you need an industry login. If you let me know which crossing, I can look it up there.
 

Step3 Star

Member
Joined
19 Dec 2019
Messages
42
Location
Cider Country
Are you looking at the downloadable PDFs? The online version (NESA) is more up to date but you need an industry login. If you let me know which crossing, I can look it up there.
Thank you for your reply and offer of help.

I do have access to NESA and can confirm the crossing even though upgraded to include the OMSL (overlay miniture stop light) unit has not been added to the TableA diagrams?

I was more curious to what defines when a crossing is included in the TableA diagrams and when not?? As in this case the Foot Crossing has been upgraded to include the OMSL unit as published in the WON (Weekly Operating Notice) Section C Notice but not added to the TableA diagrams.
 
Last edited:

Top