Hi all,

IIRC the minimum time between closure of gates and arrival of a train on a lot of level crossings in the UK is a minimum of 30 seconds.

Certainly seems that this isn't always the case abroad: in this clip the time between the two events is hardly any.
https://www.youtube.com/watch?v=u5gCNF2vtlE

Dave
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

lineclear

Member
Joined
29 Mar 2016
Messages
137
Location
Yorkshire
For clarity, for AHBs, the minimum time between amber showing and a train arriving is 27 seconds.

It's also worth noting that overall level crossing safety in Britain is better than almost everywhere else.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
IIRC the minimum time between closure of gates and arrival of a train on a lot of level crossings in the UK is a minimum of 30 seconds.

It isn't.

At a typical AHBC in the U.K., the barriers don't even start to descend until a train approaching at the maximum permissible speed is 27 seconds' running time from the crossing and after the road traffic lights have been showing for a few seconds.
 
Last edited:

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
For an automatic crossing I think it's 27 seconds (at line speed) between striking in (which will start the lights and sirens) and the train arriving. I reckon the siren starts at 7 seconds and the train reaches the crossing at 40 seconds, making it 33 seconds- but no idea if train is at line speed (seems to be accelerating?)
 