po8crg
Member
- Joined
- 6 Feb 2014
- Messages
- 559
Andy Burnham (MP for Leigh and Shadow Cabinet) has attached himself to the Transport for Leigh plan.
I don't think I'll bother explaining all the things that are wrong with this idea.
Leigh is not likely to be well-served by the LMR, whether by a station on the line (Kenyon Junction, but that's too far away), or by a spur (unlikely to be frequent).
It seems to me that are two options that are semi-realistic rather than total fantasies.
One would be to electrify the line through Atherton (ie Salford Crescent to Crow's Nest Junction), then lay tram-track along the Guided Busway route (the old railway line), build a new connection from the end of the Guided up to the railway line (between Walkden and Atherton stations). A tram-train could then serve Leigh, using the heavy rail track to Victoria and reverting to tram there. Leigh should have enough demand to justify a reasonable service frequency for trams into Manchester - two stops in Leigh, one or two in Tyldesley and one in Ellenbrook, plus one for Little Hulton where it joins the heavy rail alignment, and service the NR stations at Walkden, Moorside and Swinton plus 2x Salford.
The other would be a real rail line along the same alignment (which would mean closing the busway) and then a viaduct paralleling the Leeds-Liverpool canal to Pennington Flash and a new route across country to meet the St Helens-Wigan line just outside Bryn. There would be just two new stations, Leigh and Tyldesley. That would give St Helens Central (and other stations along that branch, ie Prescot, Eccleston Park, Thatto Heath, Garswood and Bryn, and probably the long-considered Carr Mill station) a direct, if slow service to Manchester.
Obviously the second option would be much more expensive and would require TfGM and Merseytravel to co-operate, but it would achieve multiple different transport goals in one link. There would be eight stations (five already existing, three new-build) connected to Manchester by direct services, which would presumably start at Lime Street.
Are there any other options I haven't considered that make sense?
I don't think I'll bother explaining all the things that are wrong with this idea.
Leigh is not likely to be well-served by the LMR, whether by a station on the line (Kenyon Junction, but that's too far away), or by a spur (unlikely to be frequent).
It seems to me that are two options that are semi-realistic rather than total fantasies.
One would be to electrify the line through Atherton (ie Salford Crescent to Crow's Nest Junction), then lay tram-track along the Guided Busway route (the old railway line), build a new connection from the end of the Guided up to the railway line (between Walkden and Atherton stations). A tram-train could then serve Leigh, using the heavy rail track to Victoria and reverting to tram there. Leigh should have enough demand to justify a reasonable service frequency for trams into Manchester - two stops in Leigh, one or two in Tyldesley and one in Ellenbrook, plus one for Little Hulton where it joins the heavy rail alignment, and service the NR stations at Walkden, Moorside and Swinton plus 2x Salford.
The other would be a real rail line along the same alignment (which would mean closing the busway) and then a viaduct paralleling the Leeds-Liverpool canal to Pennington Flash and a new route across country to meet the St Helens-Wigan line just outside Bryn. There would be just two new stations, Leigh and Tyldesley. That would give St Helens Central (and other stations along that branch, ie Prescot, Eccleston Park, Thatto Heath, Garswood and Bryn, and probably the long-considered Carr Mill station) a direct, if slow service to Manchester.
Obviously the second option would be much more expensive and would require TfGM and Merseytravel to co-operate, but it would achieve multiple different transport goals in one link. There would be eight stations (five already existing, three new-build) connected to Manchester by direct services, which would presumably start at Lime Street.
Are there any other options I haven't considered that make sense?