ShadowKnight
Member
It seems that the main bottleneck of the midland mainline electrification is the over road bridge at Leicester station (or nearby I actually don't know) which can't be raised nor the railway lowered without considerable expense that the current government like previous don't see any value in investing in infrastructure outside of London.
Anyway, I presume that physically an overhead wire can fit above but the electrical safety and electromagnetic field clearances preclude this.
Based on this assumption, could a short unpowered section of overhead wire/rail be installed and have to coast through this section?
Perhaps have a policy that any electric unit would have to have two adequately spaced pantographs raised to maintain electrical connection?
If that assumption is correct. Would that be feasible?
Just a thought
Anyway, I presume that physically an overhead wire can fit above but the electrical safety and electromagnetic field clearances preclude this.
Based on this assumption, could a short unpowered section of overhead wire/rail be installed and have to coast through this section?
Perhaps have a policy that any electric unit would have to have two adequately spaced pantographs raised to maintain electrical connection?
If that assumption is correct. Would that be feasible?
Just a thought