Extend the Victoria line from Walthamstow to Stratford, via Leyton Midland Road and Leyton? (Expensive, but opens a lot of new connections and would serve a lot more people than any route via Lea Bridge).
Extend the Victoria line from Walthamstow to Stratford, via Leyton Midland Road and Leyton? (Expensive, but opens a lot of new connections and would serve a lot more people than any route via Lea Bridge).
That assumes you can board this line - its busy. I doubt the Victoria line will ever be extended.
During last year's Victoria Line blockade, an express bus ran between Walthamstow and Stratford, apparently managing some pretty decent journey times. Perhaps that is the solution?

Moving past the point that it seems impossible to do any civil engineering job on rail nowadays without inordinate expenditure, the Vic Line was originally laid out to facilitate just such an extension. It was designed to continue from Walthamstow to emerge on the surface by Wood Street until quite late in the authorisation process, and there had been multiple plans after that, either to take over the Chingford line or to continue through Snaresbrook to Wanstead (it's not that far) and take over the Hainault loop.I seem to remember reading once somewhere that it would be almost physically impossible to extend the Vic from Walthamstow to anywhere without an inordinate amount of expenditure. Can anyone confirm/deny? Such memories of mine usually have some basis in fact.
Moving past the point that it seems impossible to do any civil engineering job on rail nowadays without inordinate expenditure, the Vic Line was originally laid out to facilitate just such an extension. It was designed to continue from Walthamstow to emerge on the surface by Wood Street until quite late in the authorisation process, and there had been multiple plans after that, either to take over the Chingford line or to continue through Snaresbrook to Wanstead (it's not that far) and take over the Hainault loop.
Think that the cost of additional depot space would be the issue. Northumberland Park is full, I believe, and a few trains already spend the night in platforms.

Moving past the point that it seems impossible to do any civil engineering job on rail nowadays without inordinate expenditure, the Vic Line was originally laid out to facilitate just such an extension. It was designed to continue from Walthamstow to emerge on the surface by Wood Street until quite late in the authorisation process, and there had been multiple plans after that, either to take over the Chingford line or to continue through Snaresbrook to Wanstead (it's not that far) and take over the Hainault loop.
During last year's Victoria Line blockade, an express bus ran between Walthamstow and Stratford, apparently managing some pretty decent journey times. Perhaps that is the solution?

I was surprised to learn that Walthamstow Central is now eclipsing Seven Sisters in terms of passenger numbers and that it is this which is the main driving force between having all peak time Vic line trains terminating at Central in the next few months rather than Seven Sisters.The regular RRS from Seven Sisters to Walthamstow plus the special 558 bus were much better used. These were completely packed in the rush hour with vast queues at Seven Sisters in the PM peak as the controllers sometimes struggled to keep a steady flow of buses.
I was surprised to learn that Walthamstow Central is now eclipsing Seven Sisters in terms of passenger numbers and that it is this which is the main driving force between having all peak time Vic line trains terminating at Central in the next few months rather than Seven Sisters.
I understand that the extra time required for this is minimal following last August's points replacement just outside Central.
Also, in response to the other post, good luck getting extra Chingford trains into Liverpool Street (which already has 22tph in Platforms 1-7 fed by a two track approach)...
Not entirely sure that even if extra Chingford, Enfield, Cheshunt services were possible that you would want to push commuters via Liverpool Street and onto the Central Line instead.
There were 6 tracks back in the 1960s from Bow Junction out to Stratford, four Fast and two Electric lines, so no big shakes there. Fasts used to be run alternately on either track out to the country end of Stratford, where they merged back, as this helped performance, especially with diesel powered services followed by an EMU with better performance but which was stopping at the Fast Line platforms at Stratford. An extended Modern Railways article of the period described the operation in detail. Overall there were notably more services out of Liverpool Street in the peak than nowadays, particularly before the Victoria Line opened in 1968 when a very intensive service was run to Chingford.Crossrail would not provide for any extra peak paths for "West Anglia" services, they were already allocated to GEML services, with the Bow Junction area being altered to provide extra parallel fast line paths between Stratford and Liverpool St in the peak flow direction (i.e. 2 up fast lines in the morning peak, and 2 down fast lines in the afternoon peak).
There were 6 tracks back in the 1960s from Bow Junction out to Stratford, four Fast and two Electric lines, so no big shakes there. Fasts used to be run alternately on either track out to the country end of Stratford, where they merged back, as this helped performance, especially with diesel powered services followed by an EMU with better performance but which was stopping at the Fast Line platforms at Stratford. An extended Modern Railways article of the period described the operation in detail. Overall there were notably more services out of Liverpool Street in the peak than nowadays, particularly before the Victoria Line opened in 1968 when a very intensive service was run to Chingford.
Those timetabling people just aren't trying hard enough :roll:
AGA staff info states station opening on that date AFAIK![]()

Hi Lea Bridge Road Station Is to Open W/C 16 June 2016.
I have stated actual facts In my initial joining feed I was among a two carriage load of people who travelled on the on Last Train From Lea Bridge to Stratford the was as documented a Band called "Aumt Fortescus Blues Rockers" I and a friend got talking to them we went to a gig in Praed Street ,Paddington but never turned up.
Also on the train was a female news reporter from LBC covering the event.
From Man19Hey posted 10/5/2016 -1947![]()
Hi Sorry your correct I,m reading wrong info as I don,t come on here often.That date is different to what AGA are saying on the website (https://www.abelliogreateranglia.co.uk/travel-information/station-information/leb)?

That date is different to what AGA are saying on the website (https://www.abelliogreateranglia.co.uk/travel-information/station-information/leb)?
Lea Bridge station is scheduled to open on 15 May 2016.
Services will start at 2000hrs that day.