And we are still paying the price for what Major's government did.I think the current lot are going much further then tories of the past in quite a few areas. At least under Thatcher the ECML, Cambridge, Kings Lynn, Skipton all were wired
And we are still paying the price for what Major's government did.I think the current lot are going much further then tories of the past in quite a few areas. At least under Thatcher the ECML, Cambridge, Kings Lynn, Skipton all were wired
JP on uk.railway said:I have it from a 100% reliable source within the DfT, backed up by
another source within FGW that as far as the IEP proposal is
concerned, it will be an entirely bi-mode fleet if the IEP
"champion" (SB) of the DfT wins the argument when it comes to the
Minister of State. Senior staff from TOCs are being ordered by the DfT
to attend numerous "morning briefings" as the DfT hammer out the
details, and there is a lot of anger at the refusal of the DfT to even
seriously consider the opinions of experienced railway engineers who
see the Bi-Mode IEP as a hugely wasteful train that will be very
expensive over 40 years. The money spent on this, and the possible
refurbishment of a very tired HST fleet could pay for many more miles
of electrification. At the risk of repeating myself, I spoke to a
member of the electrification survey team when they were working on St
Philips Marsh Depot in 2009. I asked him how problematical the Severn
Tunnel would be to electrify and he was adamant it was not technically
difficult. (It compares favourably with the Bakerloo Line under the
Thames according to him)
IEP has become an egotistical political train, rather than a properly
researched and engineered new generation train to replace worn out
1970s stock. The promise of a "factory" scores political points, even
if it is just a kit assembly plant which will no doubt close when the
grant aid stops at the end of the IEP build. How can the Japanese
expect to win orders within the EU if no EU country can build trains
for Japan?
One option being spoken about openly now, is the linking of the IEP
with Japan taking on a few squadrons worth of Eurofighter Typhoons for
it's FX project, currently on order for the RAF, but considered
surplus and a gift for a Govt. looking for cuts. A Planes for Trains
swap. This aircraft was evaluated by the JSDF in 2008, and the
favoured aircraft, the US built F35 is running late.
As it stands, it looks as if we will be lumbered with a train roughly
60 tonnes heavier than it should be (nearly the weight of two HST
carriages) with a slimmed down body profile to allow for the overhang
at the ends of it's 26m coaches. The servicing costs will be much
higher and the downtime longer than it would be with an all electric
design. Cost saving? Bollocks!
This is so Paddington/Reading to Newbury services can be worked by EMUs.Due to this, I wonder why you would want to electrify between Reading and Newbury.
Forgive me, I know next to nothing of services in that area. Are there any services from Reading (or anywhere between Reading and Paddington, including PAD itself) that terminate at Newbury? If so, what stock is used at present? Maybe the Oxford 395s in my suggestion could also work this route?This is so Paddington/Reading to Newbury services can be worked by EMUs.
There is a half hourly shuttle from Reading to Newbury. There is currently also a Paddingon to Bedwyn service although in theory this could be cut back to Newbury with a DMU shuttle running from Newbury to Bedwyn. As for the 319s, do you really need 140 mph trains for a commuter serivce that won't run at that speed.Forgive me, I know next to nothing of services in that area. Are there any services from Reading (or anywhere between Reading and Paddington, including PAD itself) that terminate at Newbury? If so, what stock is used at present? Maybe the Oxford 395s in my suggestion could also work this route?
There is a half hourly shuttle from Reading to Newbury. There is currently also a Paddingon to Bedwyn service although in theory this could be cut back to Newbury with a DMU shuttle running from Newbury to Bedwyn. As for the 319s, do you really need 140 mph trains for a commuter serivce that won't run at that speed.
Can't see a Newbury-Bedwyn shuttle happening or working!
There was one in the December 2004 timetable.Can't see a Newbury-Bedwyn shuttle happening or working!
They won't need a Newbury - Bedwyn shuttle because stops beyond Newbury will be taken over by the second B&H bimode IEP service running as a semifast stopper to Taunton via Westbury. It is described in the GWML RUS, as I posted a few weeks back.
140mph for the B&H semis? it would be good for 2 reasons
140 mph is out of the question on the Berks and Hants, the trains would only run at that speed from Paddington to Reading.Semi? As in "semi fast"? 140mph is only "semi fast"?![]()
140 mph is out of the question on the Berks and Hants, the trains would only run at that speed from Paddington to Reading.
Since you have informed me the Newbury electric trains would just be shuttles to/from Reading then yes, you don't need 140mph stock to run them. The basic 395s (the ones with 1/3 and 2/3 doors like the HS1 fleet) I suggested above would be for Paddington services based on an assumption that having more trains able to run at the same speed as the Intercitys would help capacity.
One of the Dafter ideas
One of the Dafter ideas was that 26m length IEP carriages with end doors could do commuter trains- the station dwell times will go through the roof.
TBH I would rather see Newbury shelved and the Severn Tunnel done.
Since you have informed me the Newbury electric trains would just be shuttles to/from Reading then yes, you don't need 140mph stock to run them. The basic 395s (the ones with 1/3 and 2/3 doors like the HS1 fleet) I suggested above would be for Paddington services based on an assumption that having more trains able to run at the same speed as the Intercitys would help capacity.
I'd rather see Newbury being dropped and Oxford-Birmingham connected by the wires.
This would allow Reading-Manchester services to be operated by the same 125mph stock as is planned for Scotrail thus releasing Voyagers.
Perhaps also allow Virgin (or their succesor) to operate direct services between Heathrow & Birmingham Edinburgh/Glasgow.
HSTs are currently used on some commuter trains out of Paddington.The same max speed argument is pants, different stopping patterns, acceleration/deceleration from stops all mean that there will always be conflicts as one service will be slower. One of the Dafter ideas was that 26m length IEP carriages with end doors could do commuter trains- the station dwell times will go through the roof.
JP on uk.railway ....... the train is a ridiculously
over complex, overweight and overly expensive design. The selection
process was changed following the selection of Hitachi as preferred
bidder to suit, Hitachi. No such luxury for the other bidders. What is
being foisted on the industry will have whole life costs that are far
higher than than the alternatives. A hybrid electric emu / dmu
employing underfloor engines, and a power to weight ratio meaning it
will be slower on many lines than HST is now.
Hitachi make much of their reliability using the 395s as an example.
Given the small number of daily diagrams compared to the size of the
fleet, it's no surprise they are working well. But of course they are
just EMus, not EDMus.
Indeed, it's not even certain it will be the route of choice for West of England services in the long term.Lets be honest, who knows what will happen with the b&h?
So why are the dft looking to sideline Wales? Is it to do with the number of services on the route that would be able to convert to electric traction?
If so, would making Mr WAG-AIR (the deputy first minster at WAG) scrap a road scheme from his national transport plan to pay for wiring of Maesteg, Ebbw Vale and Severn Tunnel Junction - Cheltenham Spa and class 377 trains to operate hourly Swansea - Cheltenham, Ebbw Vale - Newport and Ebbw Vale - Maesteg change things? Also, would rescuring the electrification to Swansea also save the railways from the disaster of bi-mode?
As for improvements in the South, would that be politically acceptable to Plaid Cymru?
As for Cardiff, wasn't there an idea in one of the RUS documents to electrify the Valley Lines? If the WAG would pay at least some of that, surely there would be no case to no continue through the Tunnel?