Fuzzytop
Member
- Joined
- 4 Jan 2017
- Messages
- 306
Evening all,
About a month ago, I was retailed (online via XC) an Advance Single, Skipton to Cambridge, travelling today:
2H29 1714 Skipton - Leeds
1A46 1815 Leeds - Stevenage
1C52 2007 Stevenage - Cambridge
It appears that, between my booking date and travel date, engineering works have been announced between Royston and Cambridge.
Due to this and the associated rail replacement buses, it’s highly likely that I’ll be getting into Cambridge at least 30 minutes after the arrival time after I booked the Advance ticket last month.
Do I have any course to delay repay in this scenario?
About a month ago, I was retailed (online via XC) an Advance Single, Skipton to Cambridge, travelling today:
2H29 1714 Skipton - Leeds
1A46 1815 Leeds - Stevenage
1C52 2007 Stevenage - Cambridge
It appears that, between my booking date and travel date, engineering works have been announced between Royston and Cambridge.
Due to this and the associated rail replacement buses, it’s highly likely that I’ll be getting into Cambridge at least 30 minutes after the arrival time after I booked the Advance ticket last month.
Do I have any course to delay repay in this scenario?