• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Last named Waverley named train September 28th 1968

Joined
8 Nov 2015
Messages
105
Does anyone know the Locomotive numbers (Probably class 45 Peaks ) that hauled the last STP to EDB and
EDB to STP Waverley daytime service on 28th September 1968?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,057
Location
Up the creek
If no other suggestions appear try the .disused-stations. website which covers all the stations and might have photos of these trains.
 

Harvester

Established Member
Joined
9 Nov 2020
Messages
1,798
Location
Notts
There would have been 4 locos involved, as both the up and down trains would reverse at Leeds, involving a loco change. I have looked at the November 1968 edition of the Railway Observer (which covers September) but surprisingly there are no reports in the LMR or Scottish region sections of the occassion!
 

70014IronDuke

Established Member
Joined
13 Jun 2015
Messages
4,099
There would have been 4 locos involved, as both the up and down trains would reverse at Leeds, involving a loco change. I have looked at the November 1968 edition of the Railway Observer (which covers September) but surprisingly there are no reports in the LMR or Scottish region sections of the occassion!
IIRC, the Waverley traditionally went via Melton to Nottingham (the 'back road') and would change locos at Leeds, on reversal, as you write.

But didn't BR close the Melton line to regular passenger in 67? (except, of course for Leicester - Peterboro' traffic).
If so, did the train go straight up the Erewash, of did it also reverse at Nottingham - so that would make it six locomotives, as the Thames-Clyde did a bit later?
But maybe Corby closed in 68, I can't remember.

Four locos or six - worth a bet that all locos were Class 45s, OP.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,057
Location
Up the creek
IIRC, the Waverley traditionally went via Melton to Nottingham (the 'back road') and would change locos at Leeds, on reversal, as you write.

But didn't BR close the Melton line to regular passenger in 67? (except, of course for Leicester - Peterboro' traffic).
If so, did the train go straight up the Erewash, of did it also reverse at Nottingham - so that would make it six locomotives, as the Thames-Clyde did a bit later?
But maybe Corby closed in 68, I can't remember.

Four locos or six - worth a bet that all locos were Class 45s, OP.

Kettering (Glendon South Junction)-Melton Mowbray and Melton Mowbray-Nottingham (London Road Junction) both closed 6 June 1966. Kettering-Melton was, and is, retained as through route to passenger standards, but Melton-Nottingham closed as a through route on 4 November 1968; the Old Dalby-Edwalton section became a test track.

Source: Hurst’s Register.
 

70014IronDuke

Established Member
Joined
13 Jun 2015
Messages
4,099
Kettering (Glendon South Junction)-Melton Mowbray and Melton Mowbray-Nottingham (London Road Junction) both closed 6 June 1966. Kettering-Melton was, and is, retained as through route to passenger standards, but Melton-Nottingham closed as a through route on 4 November 1968; the Old Dalby-Edwalton section became a test track.

Source: Hurst’s Register.
Gosh, it had already closed in 66*. Thanks. Well, that means the Waverley either missed Nottingham out, of went there and reversed - I suspect the latter.

* It means Nottingham lost two of its three principal routes to London in that year - the GC and Melton roads.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,440
Location
The Fens
A key feature of the history of the Waverley as a named train is that from 1964 onwards it was a summer dated service. In the winter the daytime through service between St Pancras and Edinburgh was portions detached/attached from the Thames Clyde Express at Carlisle.

Does anyone know the Locomotive numbers (Probably class 45 Peaks ) that hauled the last STP to EDB and
EDB to STP Waverley daytime service on 28th September 1968?
Which explains why the up and down Waverley ran for the last time on 28 September 1968, even though the last trains on the Waverley route were on 5 January 1969.
Well, that means the Waverley either missed Nottingham out, of went there and reversed - I suspect the latter.

After the June 1966 Nottingham-Melton Mowbray and Manton-Kettering closures the Waverley continued to run via Nottingham, with a reversal.

The last train on the Waverley route on 5 January 1969 was the 2155 Edinburgh-St Pancras sleeper. The loco was 60 Lytham St Annes.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,057
Location
Up the creek
Gosh, it had already closed in 66*. Thanks. Well, that means the Waverley either missed Nottingham out, of went there and reversed - I suspect the latter.

* It means Nottingham lost two of its three principal routes to London in that year - the GC and Melton roads.

The public timetable was due to start on 18 April. Until 11 June the day train was a portion of the Thames-Clyde Express, with the Waverley only running in the summer. From the beginning of the timetable all ran via Leicester.
 

Harvester

Established Member
Joined
9 Nov 2020
Messages
1,798
Location
Notts
The last train on the Waverley route on 5 January 1969 was the 2155 Edinburgh-St Pancras sleeper. The loco was 60 Lytham St Annes.
It appears that Peak “Lytham St Annes“ also worked the last northbound sleeper over the route, arriving in Edinburgh on the Sunday morning (5th Jan). When heading back south that evening, the sleeper was badly delayed by sit-down protesters on the track at Newcastleton.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,774
Location
2 miles and 50 years away from the Longmoor Milita
It appears that Peak “Lytham St Annes“ also worked the last northbound sleeper over the route, arriving in Edinburgh on the Sunday morning (5th Jan). When heading back south that evening, the sleeper was badly delayed by sit-down protesters on the track at Newcastleton.
And its journey reprieved, thanks to tactful negotiation by a young, yet-to-be Rt Hon David Steel (Lord Steel of Aikwood).
 

Top