• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Landslip at Barnehurst

Status
Not open for further replies.

rd749249

Member
Joined
15 Sep 2015
Messages
187
According to Southeastern, a land slip at Barnehurst has completely shut the Bexleyheath line today. I've always wondered why there aren't more 'strategic' reversal facilities (is that the right word?) in place to at least run partial services to/from stations not affected, when a line is blocked.

More details on their website https://www.southeasternrailway.co.uk
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
crossovers allowing reversal are extra points and signals to maintain that could fail of their own accord. Identifying locations for "strategic" turn-backs would be quite a mammoth task.
 

Antman

Established Member
Joined
3 May 2013
Messages
6,840
According to Southeastern, a land slip at Barnehurst has completely shut the Bexleyheath line today. I've always wondered why there aren't more 'strategic' reversal facilities (is that the right word?) in place to at least run partial services to/from stations not affected, when a line is blocked.

More details on their website https://www.southeasternrailway.co.uk

Yes I thought the same thing, you would think it would be possible to run a service from London as far as Bexleyheath?
 

kentman

Member
Joined
10 Jan 2015
Messages
80
From https://twitter.com/Se_Railway

Zt-tSYgn3oRKZjJ4_e9a99VOcuHVOzk9niNHMHG9UraCQKrUjt8ponCd06edoCUQnH_5bg=s190


More images (larger): https://t.co/65khK9QTfO
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
Not sure what the point would be to run a service into Bexleyheath. You could still have a situation where the landslip was before the point of reversal.

That part of Kent is still served by the other two routes that converge at Dartford as well as being able to loop back on it self. The bus network is also quite extensive.

As to the landslip. Is it the same place as usual ? There was one a wile back and a load of remedial work was done to shore up the bank.

Cheers Kentman. You can see the new banking slightly further down.
 
Last edited:

Antman

Established Member
Joined
3 May 2013
Messages
6,840
Not sure what the point would be to run a service into Bexleyheath. You could still have a situation where the landslip was before the point of reversal.

That part of Kent is still served by the other two routes that converge at Dartford as well as being able to loop back on it self. The bus network is also quite extensive.

As to the landslip. Is it the same place as usual ? There was one a wile back and a load of remedial work was done to shore up the bank.

Cheers Kentman. You can see the new banking slightly further down.

Quite obviously the point would be maintaining a service between Bexleyheath and London.

Not surprisingly the other routes into London, and indeed local buses, have been totally swamped with demand!
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
Why Bexleyheath ? What happens when there is a problem between London and Bexleyheath ?

It's very easy to go back from Dartford to Bexleyheath and Local buses come in from all directions. I find it hard to justify a turnback at Bexleyheath when the area is well served by other routes and local transport.
 

kentman

Member
Joined
10 Jan 2015
Messages
80
There are two turn back sidings on the 3 lines, at Sidcup and Plumstead. These have walkways to change ends. The other trailing crossovers (? Charlton,Kidbrooke, Barnehurst, Crayford), given their direction and location before the up platforms look more about extricating trains in a pickle back to the country direction as the driver can change ends on the platform and they have a protecting signal for the move.

I've seen them rarely used for a shuttle service during engineering works in the London direction, I assume due to issues changing ends mid line. Also not sure if it can be done in service either, as a ground position light move.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,036
Location
Frodsham
I used to commute from Bexleyheath in the 80s to Charing Cross then Cannon Street...from recollection there was crossovers at Kidbrook Falconwood and Barnehurst. I happened to go down the line from Falconwood to London via Slade Green recently, I think the Falconwood crossover has been removed.
 

island

Veteran Member
Joined
30 Dec 2010
Messages
17,910
Location
0036
Southeastern have tweeted that there will be no trains on the line until at least Friday.
--- old post above --- --- new post below ---
In the interest of maintaining capacity, is it achievable (in theory at least) to run a train on the down line as far as Welling or Bexleyheath, and then wrong way up the down line, crossing over to the up at Kidbrooke? Might have to go pilotman for the wrong way working.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
Unlikely if there is working involving mechanical diggers on the other line.
And it is also possible that they are using that line to load the "muck" into wagons.
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Yep no running tomorrow now. The closure of a very busy line is causing huge amounts of problems across SE London but the press have pretty much ignored. Roads are clogged (even more than normal) and other lines packed (again even more than normal). The press are focusing instead on nonsense about sun on a visor delaying a train for 5 mins. If it was in north or east London where the journos live...
 

Antman

Established Member
Joined
3 May 2013
Messages
6,840
Yep no running tomorrow now. The closure of a very busy line is causing huge amounts of problems across SE London but the press have pretty much ignored. Roads are clogged (even more than normal) and other lines packed (again even more than normal). The press are focusing instead on nonsense about sun on a visor delaying a train for 5 mins. If it was in north or east London where the journos live...

In fairness the press have just reported what Southeastern (perhaps unwisely?) posted on twitter. And yes serious problems on the roads and the local bus network is swamped
--- old post above --- --- new post below ---
Southeastern have tweeted that there will be no trains on the line until at least Friday.
--- old post above --- --- new post below ---
In the interest of maintaining capacity, is it achievable (in theory at least) to run a train on the down line as far as Welling or Bexleyheath, and then wrong way up the down line, crossing over to the up at Kidbrooke? Might have to go pilotman for the wrong way working.

A service as far as Kidbrooke would be better than nothing, any reason why that can't be done?
 

MikeWh

Established Member
Associate Staff
Senior Fares Advisor
Joined
15 Jun 2010
Messages
8,567
Location
Crayford
In fairness the press have just reported what Southeastern (perhaps unwisely?) posted on twitter. And yes serious problems on the roads and the local bus network is swamped
--- old post above --- --- new post below ---


A service as far as Kidbrooke would be better than nothing, any reason why that can't be done?

As there are already services to Blackheath, would one extra stop with an unusual movement afterwards really be cost effective.
 

DynamicSpirit

Established Member
Joined
12 Apr 2012
Messages
9,213
Location
SE London
I was somewhat amused by this tweet yesterday from David Evenett, MP for Bexleyheath and Crayford, in response to the landslip - clearly the kind of event that no one could have anticipated, but it looks like he's sensed an opportunity to bash the train company over it:

DavidEvenett said:
Concerned to hear about another landslip, causing trains to be cancelled all day. Shall be taking this up with Network Rail & Southeastern

My immediate reaction was, like, what's he going to tell them? "Please magically make sure that there will never ever be any more landslips"? "Please fit snow-ploughs to your trains so they can go through any landslips that happen in the future"?

(Later tweets clarify that he'll be raising issues like, why didn't they put on more replacement buses, which seems a little more sensible, although the practical difficulties in bringing in sufficient buses to replace a busy commuter line at rush hour at such short notice should be obvious).
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
I was somewhat amused by this tweet yesterday from David Evenett, MP for Bexleyheath and Crayford, in response to the landslip - clearly the kind of event that no one could have anticipated, but it looks like he's sensed an opportunity to bash the train company over it

Hopefully just seeking to understand the situation, whats being done to fix it, what the options for travel are, timescales, opportunity to visit the site and have a picture taken looking concerned etc.

The wording makes the MP look like they are in charge and doing something when really they are not. They are basically asking for a briefing!
 

Antman

Established Member
Joined
3 May 2013
Messages
6,840
As there are already services to Blackheath, would one extra stop with an unusual movement afterwards really be cost effective.

There is a very limited peak hour service at Blackheath. Given the chaos on the road network, and local buses, whatever service can be run should be run.
--- old post above --- --- new post below ---
I was somewhat amused by this tweet yesterday from David Evenett, MP for Bexleyheath and Crayford, in response to the landslip - clearly the kind of event that no one could have anticipated, but it looks like he's sensed an opportunity to bash the train company over it:



My immediate reaction was, like, what's he going to tell them? "Please magically make sure that there will never ever be any more landslips"? "Please fit snow-ploughs to your trains so they can go through any landslips that happen in the future"?

(Later tweets clarify that he'll be raising issues like, why didn't they put on more replacement buses, which seems a little more sensible, although the practical difficulties in bringing in sufficient buses to replace a busy commuter line at rush hour at such short notice should be obvious).

Playing devils advocate I don't think his comments are unreasonable;)

I'm not sure about replacement buses, people prefer to use service buses that they are familiar with. Maybe any RRB's should just run as extras on the 89 route which really has been rammed.
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
I was somewhat amused by this tweet yesterday from David Evenett, MP for Bexleyheath and Crayford, in response to the landslip - clearly the kind of event that no one could have anticipated, but it looks like he's sensed an opportunity to bash the train company over it:

Not sure he was bashing anyone over it but I was also concerned. That section slipped last year and they did do some remedial work. I would be asking questions as to was the rest of that bank inspected and why such a small section was shored up and not the entire bank. It wouldn't surprise me if it slips again.
 

island

Veteran Member
Joined
30 Dec 2010
Messages
17,910
Location
0036
Unlikely if there is working involving mechanical diggers on the other line.
And it is also possible that they are using that line to load the "muck" into wagons.

I was suggesting running as far as the stop before the landslip.

However as it's DOO there will be no monitors at the "wrong" end of the platforms so you'd need dispatchers at each station and it would only support 2tph at best, so not worth it. Assuming SET even has spare dispatchers to begin with.
 

Antman

Established Member
Joined
3 May 2013
Messages
6,840
I was suggesting running as far as the stop before the landslip.

However as it's DOO there will be no monitors at the "wrong" end of the platforms so you'd need dispatchers at each station and it would only support 2tph at best, so not worth it. Assuming SET even has spare dispatchers to begin with.

I don't think the not worth it argument is acceptable given the disruption this has caused and every effort should be made to provide whatever service is possible.
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Already looking horrible on other lines. Big crowding and delays.

One thing I noticed was that trains on other lines have had extra stops added in yet no change to timetables as they can easily slot them in. Shows how much padding is in the semi-fasts which normally sit at each station for a couple of minutes.
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
Shows how much padding is in the semi-fasts which normally sit at each station for a couple of minutes.

Considering I drive those semi-fasts I really don't see that they sit as each station for a couple of minutes. Some of those semi fasts are quite packed and station dwell times are usually down to the volume of passengers alighting.
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Considering I drive those semi-fasts I really don't see that they sit as each station for a couple of minutes. Some of those semi fasts are quite packed and station dwell times are usually down to the volume of passengers alighting.

You'd know more than me but it often seems the ones I sometimes take in the morning into London can make up time pretty easily up to Dartford from Medway if any delays, then it normally gets to Abbey Wood 2 minutes early, then Woolwich 1-2 mins early, Charlton is normally not early and a usual dwell time as seen on all stoppers, then Greenwich often has 2 mins sitting.

On the return the trip from L bridge to Greenwich the train is almost always a bit early with a minute or 90s seconds more dwell there than an all stopper, and similar happens at most stations heading back.
 
Last edited:

IanKR

Member
Joined
21 Oct 2014
Messages
90
Location
London SE9
Maybe any RRB's should just run as extras on the 89 route which really has been rammed.
And the 132.
--- old post above --- --- new post below ---
Looking at the latest picture : https://twitter.com/Se_Railway/status/687575395223388160

Looks like quite some stabilization work is required on the embankment.

And fixing/testing damaged lineside signalling equipment. Some of those tweeters are pretty ignorant.
--- old post above --- --- new post below ---
The line reopens tomorrow morning!

Is that official? I've seen this update which says it will be open tomorrow but it was posted yesterday:
http://www.networkrail.co.uk/news/2016/jan/railway-Barnehurst-reopen-Thursday-landslip/?cd=1
... could be premature?
 
Status
Not open for further replies.

Top