A rather disappointing update.
Kirkstall Forge seems to have slipped to August 2015, commuting to/from Bradford won't be realistic as it'll be a Bradford service that stops in one direction and an Ilkley service in the other. A disappointing 1 tph of the 6-8 passing. Thought I'd seen before that this would be 2tph.
Nothing on Apperley Bridge.
http://www.westyorks-ca.gov.uk/WorkArea/DownloadAsset.aspx?id=4294967867
Kirkstall Forge seems to have slipped to August 2015, commuting to/from Bradford won't be realistic as it'll be a Bradford service that stops in one direction and an Ilkley service in the other. A disappointing 1 tph of the 6-8 passing. Thought I'd seen before that this would be 2tph.
Nothing on Apperley Bridge.
http://www.westyorks-ca.gov.uk/WorkArea/DownloadAsset.aspx?id=4294967867
2.46 The station is expected to be open in August 2015 and initially will be served by 1
train per hour in each direction; additional stops on the Leeds – Bradford Forster
Square service (westbound) and the Ilkley – Leeds service (eastbound). The station
will include a new footbridge and lifts, and a 127 space car park.
Last edited: