Based on current NR route boundaries, that makes sense. That, and the reliance on Syston to Manton for MML diversions. However, is there room for it in the EMCC? I was led to believe that the most recent resignalling proposal (10-15 years ago), it was first envisaged that it'd be split between the existing Kettering and Leicester workstations, but that the workload (including at least a couple of the crossings that wouldn't be suitable for MCB-OD, plus some busy UWCs) meant that it'd actually need at least one and possibly two workstations of its own. I can't remember whether that was an issue because of a lack of space, or just an economic argument knocking the business case down, or indeed a not really an issue at all. Splitting the two ex-Leicester workstations into three might have changed that again, of course.