February 2026 – Kenya and Uganda Railways – Latest News
I have also been writing an update focused on Kenya, it touches on some of the same things that you have, but I will share it anyway:
Phase 2b of the SGR (Standard Gauge Railway) has started construction. This will extend the route 264km from its current end point near Naivasha (
-1.143983, 36.182707), to Kisumu. Phase 2c should see the route completed to Malaba on the Uganda border, mirroring the colonial meter gauge system. Though it will take a different route avoiding Nakuru, unlike Phase 1 Mombasa – Nairobi which largely followed the meter gauge line.
Chinese contractor China Communications Construction Company (CCCC) is being used again:
Kenya launches construction of Naivasha-Kisumu-Malaba Standard Gauge Railway
Kenya launches Naivasha–Kisumu–Malaba SGR construction
In the 2024 rainy season a massive washout/landslide occurred near Kijabe, between Nairobi and Naivasha. This can been seen on google maps, as well as the large storm drain that has been constructed. (-0.916124, 36.575138). This line has now been reconstructed and a press/test train has ran, but I understand that the Nairobi-Kisumu passenger ’safari train’ has yet to recommence.
Kijabe railway line hit by Maai Mahiu tragedy finally reopens | Daily Nation
Kenya Railways Nears Completion of Uplands–Kijabe–Longonot Rail Restoration | Tukio
Uplands-Kijabe-Longonot Rail Section Clears Test Run Ahead of Freight Resumption - Mjengo Hub
An extension to the Nairobi Commuter Rail service is being built. This 12.5km extension from Riruta to Ngong leaves the current meter gauge network near Lenena school, where a new station and passing loop have been built (-1.298371, 36.745943), and then terminate at a new station in Ngong (-1.349521, 36.658960). Google Maps so far shows only construction at Ngong, I’m not sure what route it will take as the Karen area is quite built up (and affluent!). Indeed some people don’t want it to go ahead:
Karen residents threaten to block construction of Sh1.2 billion Ngong rail
Court approves Riruta-Ngong Railway Project, Kenya 2026 - Africa Pulse Media
This project got blocked in the courts at the start of this year, but has since been released:
High Court suspends construction of Ngong - Riruta railway
Court Lifts Orders Halting Construction of Ksh11.5B Riruta-Ngong Commuter Rail - Kenyans.co.ke
The Nairobi commuter rail service uses secondhand CAF DMUs imported from Mallorca, as well as loco hauled services. It’s not an all-day metro service, but has a few services in the morning and evening, for commuting I guess.
However, a project has been launched to modernise the Nairobi – Thika line, which in my opinion hopefully will see it have a higher frequency and segregated right of way.
World Bank Commits Ksh 65 Billion for Nairobi-Thika Commuter Rail Upgrade - Kenyans.co.ke
There are proposals to extend the meter gauge railway by 400 miles into the relatively underdeveloped northwest of the country. This would extend from Nakuru to South Lokichar. This proposal would replace a proposed crude oil pipeline, and would cost more, but of course can carry other things apart from crude oil and remain useful after the oil runs out.
The articles say that a standard gauge line had been considered, but would cost twice as much, as meter gauge line would “navigate the topography with minimal tunnelling,” which “significantly reduces construction complexity and cost.” This suggests the line will have minimal earthworks, follow the landscape and be quite slow, much like the existing system, which explains the cheap price tag . Of course, it also means no transhipment will be required at a break of gauge.
Kenya considers $1.7 billion upgrade of colonial-era rail to export crude to an Indian Ocean port by 2030 | Business Insider Africa
Kenya Mulls $1.7 Billion Rail Extension to Ex-Tullow Oil Fields | Financial Post
Kenya Considers Nakuru-South Lokichar Railway Extension Amid $1.7 Billion Upgrade of Colonial Era Rail