This is a new one on me....from the TFW journey check


20/11/22 19:43 Cardiff Central to Maesteg due 20:35 will be cancelled.
This is due to Unspecified delays
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ashley Hill

Established Member
Joined
8 Dec 2019
Messages
5,568
Location
The West Country
Either there is multiple delays that are hard to explain to the public,eg- traincrew delayed travelling on a GWR service that is stuck at a signal due to multiple track circuit failures. Perhaps failed on shed waiting parts. Or they don’t know what the delay is.
 

uww11x

Member
Joined
9 Sep 2012
Messages
402
Either there is multiple delays that are hard to explain to the public,eg- traincrew delayed travelling on a GWR service that is stuck at a signal due to multiple track circuit failures. Perhaps failed on shed waiting parts. Or they don’t know what the delay is.
There's always a cause for a delay/cancellation. To say it's unknown is simply not true.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
There's always a cause for a delay/cancellation. To say it's unknown is simply not true.
The cause of a delay may not be known for some time. Railway controllers aren't clairvoyant.
Just because something exists doesn't mean it is known, or passed on for the right people to act on it.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,180
Location
LBK
The cause of a delay may not be known for some time. Railway controllers aren't clairvoyant.
Just because something exists doesn't mean it is known, or passed on for the right people to act on it.
Indeed. If a train is stopped in a section or has lost significant time and not responding, the cause of the delay may well be unknown.
 

uww11x

Member
Joined
9 Sep 2012
Messages
402
Indeed. If a train is stopped in a section or has lost significant time and not responding, the cause of the delay may well be unknown.
Having worked in TDA for numerous years, finding the cause is relatively easy
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Having worked in TDA for numerous years, finding the cause is relatively easy
But it may not be known immediately, and when it is known disseminating the information to the required people can take a few minutes.

But your basic premise was flawed:
There's always a cause for a delay/cancellation. To say it's unknown is simply not true.
Something existing (the cause) is completely independent of it being known. It can be perfectly true to say that there is a cause for the delay, but that they don't know what it is yet.
 

High Dyke

Established Member
Joined
1 Jan 2013
Messages
4,995
Location
Yellabelly Country
Neatly dovetailing into this thread, I've noticed this. NRE is showing disruption between Chinley & Edale, due to a tunnel inspection that is affecting Northern, TPE and EMR services. However, EMR services are not running between Sheffield and Stockport, due to planned engineering - according to EMR twitter.

NRE also states that EMR services are only operating between Sheffield and Norwich, but EMR state that train services are not operating between Nottingham and Ely, again due to planned engineering work. So my point is, how are everyday passengers supposed to know or understand when conflicting information is being supplied.
 

uww11x

Member
Joined
9 Sep 2012
Messages
402
But it may not be known immediately, and when it is known disseminating the information to the required people can take a few minutes.

But your basic premise was flawed:

Something existing (the cause) is completely independent of it being known. It can be perfectly true to say that there is a cause for the delay, but that they don't know what it is yet.
I've just checked 2L63 and it's shown as a planned cancellation (PG),so the internal reason was known by at least 22:00 the night before.
Why is there ZZ delay then? And why do people reattribute, i've done it enough.
If used correctly ZZ would be a for 1 to 2 minute self delay which didn't delay anything else. Thus not warranting the investigation from the NR Level 1 point a view.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
I've just checked 2L63 and it's shown as a planned cancellation (PG),so the internal reason was known by at least 22:00 the night before.
Well then in this case they got it wrong and failed to make sure the correct information was sent downstream.
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,435
Location
Northern England
Even if it's possible to find the cause with a few minutes' investigation, it is better to publish the information then add the reason in later than to mislead passengers by withholding the information until a reason is available.

And if there is severe disruption, then as a passenger, I'd much rather have every delay/cancellation detailed accurately than some trains with inaccurate information because they weren't updated because the people responsible were too busy investigating delay reasons.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
Even if it's possible to find the cause with a few minutes' investigation, it is better to publish the information then add the reason in later than to mislead passengers by withholding the information until a reason is available.

And if there is severe disruption, then as a passenger, I'd much rather have every delay/cancellation detailed accurately than some trains with inaccurate information because they weren't updated because the people responsible were too busy investigating delay reasons.

I think this is the key point.

The what rather than than why is what impacts people and their contingency planning, hence dissemination of this should always be the priority, even if the reasons for disruption are not known.

Something else that’s often forgotten on a subject specific forum is that a significant majority (probably 99%) of railway passengers have zero interest in or understanding of operational minutiae, so will find detailed explanations utterly meaningless and likely unwelcome.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,728
Even if it's possible to find the cause with a few minutes' investigation, it is better to publish the information then add the reason in later than to mislead passengers by withholding the information until a reason is available.

And if there is severe disruption, then as a passenger, I'd much rather have every delay/cancellation detailed accurately than some trains with inaccurate information because they weren't updated because the people responsible were too busy investigating delay reasons.
It's about the language used, though. "Unspecified" or "Unknown" has a strong implication that the company doesn't know what it is doing.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Something else that’s often forgotten on a subject specific forum is that a significant majority (probably 99%) of railway passengers have zero interest in or understanding of operational minutiae, so will find detailed explanations utterly meaningless and likely unwelcome.
This is true, although providing an explanation of 'Unspecified delays' is arguably worse than nothing at all. It's also self-defeating - after all, you've specified the delays by clarifying that they're unspecified! In contrast, saying nothing would, by default, mean they were unspecified.

However @uww11x has pointed out TfW had cancelled it the night before, so they should have been able to change the message to 'this is a short-notice planned cancellation' or similar
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
This is true, although providing an explanation of 'Unspecified delays' is arguably worse than nothing at all. It's also self-defeating - after all, you've specified the delays by clarifying that they're unspecified! In contrast, saying nothing would, by default, mean they were unspecified.

Yes, it’s poor phrasing. There has generally been a move away from phrases that sound like code for BS (eg “delay is due to operational reasons”), but this is a poor choice of wording.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Neatly dovetailing into this thread, I've noticed this. NRE is showing disruption between Chinley & Edale, due to a tunnel inspection that is affecting Northern, TPE and EMR services. However, EMR services are not running between Sheffield and Stockport, due to planned engineering - according to EMR twitter.

NRE also states that EMR services are only operating between Sheffield and Norwich, but EMR state that train services are not operating between Nottingham and Ely, again due to planned engineering work. So my point is, how are everyday passengers supposed to know or understand when conflicting information is being supplied.
Honestly, the customer should trust the company they are traveling with, although NRE is overall the best source for this information, when it is conflicting it is best to check who you are actually travelling with ie. who's running the train.
 

Jozhua

Established Member
Joined
6 Jan 2019
Messages
1,891
Honestly, this sort of "unspecified" delay seems to have improved significantly over time.

I remember probably 5-10 years ago, reasons were not often specified for delays in my part of the world, but these days it seems to be much better.
 