The Cambrian has been single for absolutely yonks (which I know you know - so not sure what you mean) - they've lifted (in the past few weeks) the head shunt of the Coleham sidings (which is what you see missing there - only the buffer stop at the very end, just visible on the photo below, remains). I suspect it will be relayed at some point soon.... well, I hope. They are relaying the sidings they lifted last year on the other side of Sutton Bridge.
http://david100.fotopic.net/p50817851.html
--- old post above --- --- new post below ---
Never quite got the hang to shooting under wires myself matey!!
Only wires we have to contend with is telegraph poles :razz:
Indeed - I love how the only electrified railway in the whole of Shropshire is the Bridgnorth Cliff Railway. I doubt electrification will ever arrive in the county... hydrogen fuel cell and steam powered locos replacing the diesels eventually!!
In other Salopian infrastructure news - the Coton Hill sidings have been rationalised and relayed as house building takes place there too.
Coton Hill now consists of 4 long sidings and a run-round line (so 5 in total). Are they actually ever used these days? Infrastructure trains?