hexagon789
Veteran Member
No changes.Completely agree re that relatively large gap. Any idea if that's being filled in on June 2024 timetable?
No changes.Completely agree re that relatively large gap. Any idea if that's being filled in on June 2024 timetable?
Running a Liverpool-Stalybridge EMU service in the other half-hour would be useful, as Northern did (with DMUs) before any of the wires went up.I hope they bring it back at some point, but at the moment it doesn't seem likely anytime soon.
From my understanding of it, the determining factor doesn’t seem to be how often it happens, but the impact when it does happen.Thanks for that explanation, as under normal operation only a couple of freights a day are booked into the goods line at Colchester rather than at least 2 passenger services an hour I wonder if this could ever be reviewed? Of course at times of disruption it occurs more frequently and there‘s some ECS services too.
The GEML has had massive investment in the OHL which was ongoing for years & years. Thats why we no longer have heat related speed restrictions on it.Thanks for that explanation, as under normal operation only a couple of freights a day are booked into the goods line at Colchester rather than at least 2 passenger services an hour I wonder if this could ever be reviewed? Of course at times of disruption it occurs more frequently and there‘s some ECS services too.
I do wonder if the infrastructure on the GEML could be considered for reviewing in a similar way as mentioned recently in Modern Railways for the north end of the WCML? At times the division between renewal and enhancement seems too restrictive when there might be opportunities for modest improvements that could make a real difference.
The signalling on the main lines through Stratford was designed for non stop running, long before the Olympics and everything that subsequently bought to the area. Today you would probably design it with more signals and a lower linespeed, like the electric line is.So they spent millions upgrading the track, signalling, turnouts etc to raise the speed limit from 70 to 90mph years ago....only for the majority of trains to poodle along because the timetable isn't written efficiently to make use of it lol. What makes me laugh is when a Southend or Colchester Town service to London calling at Romford still catches the previous service up that was non stop!!
a further move to relieve crowding on some of CrossCountry’s long-distance services this summer will see temporary changes to the timetable - meaning busier services will make fewer station calls from June to September only.
Adjusting these calling patterns – at Wakefield Westgate and Chesterfield, Basingstoke and Winchester – encourages passengers making shorter journeys to switch to other operators, providing more capacity for CrossCountry customers making longer journeys.
Expect those to become permanent or an "extended trial"Extra of the Cross Country Press Release, changing calling patterns
![]()
Bigger fleet, more seats: CrossCountry reveals plans to transform customer experience by May 2025 | CrossCountry
Train operator announces massive expansion to long-distance fleet, transforming journeys with around 25% more seats available than today.www.crosscountrytrains.co.uk
Does this mean services running centre road through Wakefield Westgate?Extract of the Cross Country Press Release, changing calling patterns, and since when has there been a September timetable change
![]()
Bigger fleet, more seats: CrossCountry reveals plans to transform customer experience by May 2025 | CrossCountry
Train operator announces massive expansion to long-distance fleet, transforming journeys with around 25% more seats available than today.www.crosscountrytrains.co.uk
If XC no longer call at Chesterfield will the running times be speeded up or will the trains wait a further 5 minutes at Derby southbound and 5 minutes at Sheffield northbound in lieu of the Chesterfield call.Expect those to become permanent or an "extended trial"
Unlikely the journey times will be sped up as XC will be more than happy with the extra dwell time at Derby.If XC no longer call at Chesterfield will the running times be speeded up or will the trains wait a further 5 minutes at Derby southbound and 5 minutes at Sheffield northbound in lieu of the Chesterfield call.
since when has there been a September timetable change
But they haven't got these extra trains yet hence the hopefully temporary changes until they arrive.Not calling at Basingstoke is a disgrace. Given that they’ve just announced an extra 5x Avanti 221s in addition to the 7 already being obtained, there’s no excuse for single-sets in the Bournemouth turns which should provide enough capacity to serve the stations they’re contracted to!
There has always been a September change with many summer dated trains ceasing running then (think Summer Saturday additionals to Penzance, Newquay, Paignton, Weymouth and Pembroke).
It’s contained as in a date set within the June to December timetable and the trains will be ‘dated’ accordingly.
Was always a ‘wiggly’ line through the middle of the times in the GBTT meaning this train does not operate for the full duration of this timetable.
Unfortunately in recent years the GBTT has become overrun with ‘dated trains’ due to a general inability to mask minor variations in working times from period to period using judicious public book differentials to maintain a standardised publicly advertised schedule throughout. I’ve seen ‘wiggly lines’ used for simple platforming variations! Proper timetabling is becoming a lost art.
Me too! Table 51 Summer Saturdays was always the first place to look if it was a May edition. I got hooked on timetabling when RAIL published a puzzle in the late 90s, challenging readers to work out how all the C of E bishops would reach Canterbury for a synod meeting without using London terminals. Quite a few hours spent working it all out and then I never actually saw what the solution was (perhaps it proved too difficult to judge…)Such a shame. I used to look forward to the GBTTs when the timetable changes where May & September. Read them like a good book.
Me too! Table 51 Summer Saturdays was always the first place to look if it was a May edition. I got hooked on timetabling when RAIL published a puzzle in the late 90s, challenging readers to work out how all the C of E bishops would reach Canterbury for a synod meeting without using London terminals. Quite a few hours spent working it all out and then I never actually saw what the solution was (perhaps it proved too difficult to judge…)
There are some still around who know how to timetable properly, but this requires above all, time to do a methodical and accurate job. A combination of late decision making, whether it be DfT, NR, TOC directors or whoever, and diversion of staff onto strike timetables, is not giving those responsible sufficient time to do a proper job, much to their frustration too.Proper timetabling is becoming a lost art.
Not calling at Basingstoke is a disgrace. Given that they’ve just announced an extra 5x Avanti 221s in addition to the 7 already being obtained, there’s no excuse for single-sets in the Bournemouth turns which should provide enough capacity to serve the stations they’re contracted to!
Same for Chesterfield, not only will it lose it’s only direct Birmingham (and beyond) train but the only direct train to Leeds will be the totally inadequate 2 car Northern train which is regularly full and standing even at off peak times!Especially in my experience of using northbound XC services from Basingstoke, the busy section tends to be after Reading & Oxford. Southbound trains tend to empty out at Reading. Unless there is a cruise at Southampton or kickball traffic (Southampton vs team from West Midlands etc)
The trains will just end up sitting at Southampton Airport Parkway for the correct dwell time when passengers for Winchester from the Oxford direction find themselves having to change twice with some rubbish connections considering Basingstoke -> Southampton is 1tph. If XC cared about "encourages passengers making shorter journeys to switch to other operators, providing more capacity for CrossCountry customers making longer journeys." they would skip Coventry & Wolverhampton, as no doubt they get more local passengers from Wolverhampton/Coventry travelling to Birmingham then they get Basingstoke passengers travelling to Reading [probably doesn't help that the timetable at Basingstoke where the stopper tends to depart quite soon after the XC] Northern simply won't cope with the extra passengers from Wakefield to Sheffield, they can barely cope already on the Leeds - Wakefield - Barnsley - Sheffield services.
But people can take the EMR twice an hour intercity services to change at Derby or Sheffield respectively.Same for Chesterfield, not only will it lose it’s only direct Birmingham (and beyond) train but the only direct train to Leeds will be the totally inadequate 2 car Northern train which is regularly full and standing even at off peak times!
It might very well be that the changes haven't yet been enacted, if they're late-notice. But yes, skipping Basingstoke is absolutely ridiculous as it allows connections to/from lots of SWR stations. It also forms a key part of the Basingstoke-Reading service, particularly on Sundays when GWR only run 1tph.A quick look at RTT suggests:
Chesterfield is very little changed from the present (ie a fair number non stopping)
Wakefield loses several calls on Saturday 15 June (and presumably other Saturdays, but not yet showing?), none on weekdays.
Basingstoke has a random one on 15/6 and Winchester none that I can find. Obviously that is incomplete, but are we reading too much into a press release?
since when has there been a September timetable change
The regions issued separate summer and winter timetables up to 1964. There was a return to separate summer and winter timetables in 1986 which lasted until privatisation. For the period in between there were still some significant changes in September/October, but with the changes given in supplements to the May timetable.I used to look forward to the GBTTs when the timetable changes where May & September.
Yes, it’s not really been mentioned until you said it, but this is really going to damage Sheffield-Wakefield traffic as the remaining options are incredibly poor.Especially in my experience of using northbound XC services from Basingstoke, the busy section tends to be after Reading & Oxford. Southbound trains tend to empty out at Reading. Unless there is a cruise at Southampton or kickball traffic (Southampton vs team from West Midlands etc)
The trains will just end up sitting at Southampton Airport Parkway for the correct dwell time when passengers for Winchester from the Oxford direction find themselves having to change twice with some rubbish connections considering Basingstoke -> Southampton is 1tph. If XC cared about "encourages passengers making shorter journeys to switch to other operators, providing more capacity for CrossCountry customers making longer journeys." they would skip Coventry & Wolverhampton, as no doubt they get more local passengers from Wolverhampton/Coventry travelling to Birmingham then they get Basingstoke passengers travelling to Reading [probably doesn't help that the timetable at Basingstoke where the stopper tends to depart quite soon after the XC] Northern simply won't cope with the extra passengers from Wakefield to Sheffield, they can barely cope already on the Leeds - Wakefield - Barnsley - Sheffield services.
That train is going to be unbearable then now. I’d just switched to using that instead of XC. I now will just drive as the all station stoppers are painful.Same for Chesterfield, not only will it lose it’s only direct Birmingham (and beyond) train but the only direct train to Leeds will be the totally inadequate 2 car Northern train which is regularly full and standing even at off peak times!
The regions issued separate summer and winter timetables up to 1964. There was a return to separate summer and winter timetables in 1986 which lasted until privatisation. For the period in between there were still some significant changes in September/October, but with the changes given in supplements to the May timetable.
It is the December timetable change that is a relatively recent phenomenon. If I remember rightly this was linked to the opening of the Channel Tunnel.
This sucks for those of us who change onto/off of XC at Chesterfield to get to/from Nottingham. Chesterfield is a very convenient same platform change when heading north or returning from the north. And those of us from Nottingham will now be staying on between Chesterfield and Sheffield, further overcrowding the already inadequate 2-coach Leeds services. But that's fine for XC, makes it Northern's problem instead.Extract of the Cross Country Press Release, changing calling patterns, and since when has there been a September timetable change
![]()
Bigger fleet, more seats: CrossCountry reveals plans to transform customer experience by May 2025 | CrossCountry
Train operator announces massive expansion to long-distance fleet, transforming journeys with around 25% more seats available than today.www.crosscountrytrains.co.uk