In your humble opinion, which Junctions on the Network Rail system require remodelling to provide an enhanced passenger & freight service?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,082
Location
Redcar
That flat diamond crossing north of Newark North Gate where the Lincoln to Nottingham line crosses the ECML. That really needs to be a flyover.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Hitchin's a long way further advanced than merely thinking about it; there are pegs in the fields and ground works have started for it.
 

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
I agree that Newark flat crossing requires rebuilding with a flyover.

Dore requires redoubling to improve Hope Valley services.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Whilst we're on doubling junctions, Syston's a bit of a bottleneck on a major freight route; surprised it wasn't included in the Nuneaton–Felixstowe upgrade plans.
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
Shaftholme on the ECML (though in common with the Hitchin flyover, plans are already well advanced).
Carstairs north <-> east and south <-> east.
Westerleigh (though that's maybe not just re-modelling as beginning the curve west of the river)
London Bridge to Blackfriars (though if that isn't adequately improved by Thameslink programme then we might as well all give up now).
Camelon (Falkirk).

But as jimmyowl1992 asked, how long ?
There are also existing junctions where the construction of a new chord (converting a junction into a triangle) might greatly improve journey opportunities and facilitating shorter freight movements, even allowing them to avoid conflicts with many passenger services.
Another stragegy, albeit expensive, is the flyover / diveunder as proposed for the north of Hitchin; (these greatly reduce the conflicts on opposing lines, especially where there are quadrupled through lines).

[Shouldn't this thread be in the Infrastructure forum?]
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
Windmill Bridge et al up by East Croydon are a recognised issue.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Norton Bridge is another one in the pipeline (preferred option is a massively separated GSJ, which should allow more slow trains in that part of the world).
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,553
Location
Somewhere
With an increase in freight services (and more in the future), Haughley Jnc on the GEML could do with being a double junction rather than the current single lead setup.
 

43106

Member
Joined
6 Jul 2008
Messages
384
Location
South-ish Edinburgh
There are TYPES of junctions that I don't understand. An example is Temple Hirst, just north of Doncaster. In case you don't know it. there's a crossover from the down line to the up line. The actual junction then branches off as a single line from the up line, then opens up to 2-track. I do know that Euxton junction was like this, but has since been rebuilt to what I would call a conventional 2-line junction. What's the thinking behind this design?
 

43106

Member
Joined
6 Jul 2008
Messages
384
Location
South-ish Edinburgh
No crossovers. A convential fork would have the down branch crossing the up main (or vice versa) at an oblique angle.
What's wrong with a crossover? Similarly, what's wrong with crossing a line at an angle? As far as I can see, a junction like Temple Hirst creates a bit of a bottleneck, but I have a nasty suspicion I'm missing something. (Having said that, the traffic must be fairly light between Temple Hirst and Selby)
 

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
As for Euxton Junction, it was originally a single lead junction with signal protecting it from the mainline. The junction was rebuilt with double track & a crossover nearer to Chorley so that trains off the slow lines can run via the Down Fast, then use the new crossover to regain the correct line towards Chorley.
 

RichmondCommu

Established Member
Joined
23 Feb 2010
Messages
6,906
Location
Richmond, London
The southern approaches to Derby station are a nightmare due to the conflicting movements from two very busy mainlines. The lack of space means that the situation will never improve. I frequently travel up from London to the Motherland and almost always get held outside the station by Etches Park.
 

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,457
Location
Milton Keynes
Colwich Junction. I think there have been two instances in my entire life where I've been on an ex-Stafford train that hasn't had to wait for something there.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
What's wrong with a crossover? Similarly, what's wrong with crossing a line at an angle? As far as I can see, a junction like Temple Hirst creates a bit of a bottleneck, but I have a nasty suspicion I'm missing something. (Having said that, the traffic must be fairly light between Temple Hirst and Selby)

Wear and tear on the diamond crossing vees is the usual explanation, where the metal thickness tapers away to nothing at the point where the wheel has to cross a significant gap.

So I understand that unless there are space constraints that prevent it current practice is to use a 'simplified double junction' layout - where a train weaves onto the other track and then onto the branch (and vice versa). Simultaneous parallel moves in the up and down directions are still available, the route in one direction uses a single set of points, the route in the other direction goes over three sets of points. This is a longer layout than a traditional double junction with a crossing though.
 
Last edited:

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
Water Orton, diabolical layout currently.
Water Orton was remodelled to its present shape in the 70s/80s to get rid of the diamond crossing in the Down Fast, which kept being hammered to pieces because of its location, which made it a complete B*stard to keep the track geometry OK.



What's wrong with a crossover? Similarly, what's wrong with crossing a line at an angle? As far as I can see, a junction like Temple Hirst creates a bit of a bottleneck, but I have a nasty suspicion I'm missing something. (Having said that, the traffic must be fairly light between Temple Hirst and Selby)
If I recall Temple Hirst correctly there were two reasons, one relating to traffic levels and the other one down to the fact that there was insufficient room to fit crossovers in so as to retain the double junction. Both switch diamonds and fixed diamond crossings cause enormous problems in terms of the need for enhanced maintenance, and during hot weather the HW detector and operating rods are prone to fouling one another.

The actual crossings themselves are also subject to fairly rapid deterioration and caused both ride and wheel problems especially when running at high speed.
 
Last edited:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,287
Would adding two platforms at Northallerton on the current freight only lines and then completely removing the flat junction north of the existing station count?

That has to be an annoying bottleneck.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,665
Would adding two platforms at Northallerton on the current freight only lines and then completely removing the flat junction north of the existing station count?

That has to be an annoying bottleneck.

Well youd think wouldnt you, always seems to defeat the object me having a lovely flyover but passenger trains cant use it!

dont know if the current location of station is prime and moving it would make it worse, someone with more knowledge would have to comment on that.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
You could add platforms to the off lines without too much trauma, but it would really spread out the size of the station, perhaps just the Northbound ones...
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
Water Orton, diabolical layout currently.
Another vote for Water Orton, when you go towards Whitacre Jcn you end up being dead on with the Birmingham-Derby main that you left at 30mph and you crawled along wrong line after for some time. Whitacre could also do with straightening out, just buy that field and realign the main instead of the silly curves. Both of these would help keep freight on the route up to speed. Currently they accelerate from Landor St or Lawley Street, slow down to 30 at Water Orton, accelerate again only to go down to 30 again at Whitacre and have to accelerate up the gradient to Daw Mill and Arley.
 

Minilad

Established Member
Joined
26 Feb 2011
Messages
4,396
Location
Anywhere B link goes
I would go with Norton Bridge and Water Orton as the worst two I go over. Some station approaches are a lot worse but that doesn't really fall under the remit of this thread I guess
 