• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Jubilee Line Tunnel Work

Status
Not open for further replies.

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
Corosion from acidic water in the origanal 1970s jubilee line tunnels has got so bad that they're being 'retunneled'. This video from the BBC explains that they'll be repairing the tunnels throughout several closures spread from this summer to 2015.

http://www.bbc.co.uk/news/uk-england-london-22340598

Jubilee Line repair work spread over months

VIDEO

29 April 2013 Last updated at 19:47 Help
Passengers on the Jubilee Line face at least 30 days of disruption, spread over two years, due to repair work to tunnels.

Stations between Finchley Road and Waterloo will be affected by the work on tunnel linings to repair the damage caused by acidic groundwater.

Transport for London said the work is planned for weekends and public holidays.

BBC London's Marc Ashdown spoke with Caroline Pidgeon, leader of the Liberal Democrat London Assembly group, and Nigel Holness from London Underground.

Read More

Tube line to shut for tunnel repairs
Share this page

16
ShareFacebookTwitter
Email
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,802
Location
Epsom
In the Evening Standard on Monday there were quite a few people calling for this work to be done in a single long blockade during August; I have to say I agree with them.
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,172
Location
0035
I disagree; whilst some people might be lucky enough to get a whole month off work, for most of us August is still a working month like the rest, and the Jubilee line is a vital route for many to access their employment, the majority of which takes place on Monday to Friday.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
I agree with Mojo. The biggest problem with long blockades is freeing up staff to attend to them, while ensuring the regular maintenance that they'd otherwise be doing gets done.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,802
Location
Epsom
Don't most of the journey options offered via the Jubilee have alternative routes available, albeit I admit they take a bit longer?
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,172
Location
0035
And may potentially be a lot more crowded too. My alternative to the Jubilee line would be via Victoria station, and the Victoria line, the former of which is already at capacity.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
I think there's also an issue with having peak time turnback at Waterloo- basically they couldn't actually run an intense enough service on the eastern part of the line, which would lead to dangerous overcrowding on the station platforms
 

bicbasher

Established Member
Joined
14 May 2010
Messages
1,835
Location
London
Out of the stations affected, it's only St. John's Wood and Swiss Cottage passengers which would be the most affected, but they have local bus routes which would connect them to Baker Street.

Finchley Road has the Met for Jubilee passengers to change over to Baker Street, while the Bakerloo would be a substitute for those in the Zone 1 section to travel between Baker St and Waterloo to rejoin the line to Stratford.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
and that's what people will have to do- during the off-peak closures. That wouldn't work during peak commuting hours due to sheer weight of numbers
 
Status
Not open for further replies.

Top