rmHawk765
Member
This may delve into speculative discussion a little, can be moved if needed.
I've talked about this on the forum before but never made a full post about it (apart from speculative discussion). Is it just me, or are the ECML inner suburban lines out of Moorgate starting to lack capacity due to a number of limiting factors, particularly at peak?
By Finsbury Park in the evening peak, Down trains can be very packed. And off-peak, the shoddy 2tph schedule makes the service rather inconvenient to use, with occasional excessive crowding as well.
The other problem, mostly at peak again, appears to be that 6 coach trains simply aren't enough.
The service is 4tph on both to Welwyn and on the Hertford Loop at peak, and it raises the question of whether increasing the service but continuing to use 6-coach trains would even have a major impact.
This brings me onto my opinion that the 717 order was somewhat short-sighted - it was created to maximise capacity with the existing platforms, which it has successfully done, but it didn't exactly factor in an increase in passenger numbers, like what can be seen now.
I don't know how difficult it would be to lengthen the platforms, particularly on the Northern City Line, to allow 8 or 12 coach trains where it is not so already, i.e most of the inner suburban ECML stations - however it seems like such a project could prove very beneficial if possible.
You also have the option of running to King's Cross to avoid lengthening the platforms on the NCL specifically.
Does anyone else feel the lines are not up to scratch capacity-wise now, and that GTR could've planned better for the future with the 717 order?
I've talked about this on the forum before but never made a full post about it (apart from speculative discussion). Is it just me, or are the ECML inner suburban lines out of Moorgate starting to lack capacity due to a number of limiting factors, particularly at peak?
By Finsbury Park in the evening peak, Down trains can be very packed. And off-peak, the shoddy 2tph schedule makes the service rather inconvenient to use, with occasional excessive crowding as well.
The other problem, mostly at peak again, appears to be that 6 coach trains simply aren't enough.
The service is 4tph on both to Welwyn and on the Hertford Loop at peak, and it raises the question of whether increasing the service but continuing to use 6-coach trains would even have a major impact.
This brings me onto my opinion that the 717 order was somewhat short-sighted - it was created to maximise capacity with the existing platforms, which it has successfully done, but it didn't exactly factor in an increase in passenger numbers, like what can be seen now.
I don't know how difficult it would be to lengthen the platforms, particularly on the Northern City Line, to allow 8 or 12 coach trains where it is not so already, i.e most of the inner suburban ECML stations - however it seems like such a project could prove very beneficial if possible.
You also have the option of running to King's Cross to avoid lengthening the platforms on the NCL specifically.
Does anyone else feel the lines are not up to scratch capacity-wise now, and that GTR could've planned better for the future with the 717 order?
Last edited by a moderator: