Indeed currently 2023 which does fit any of the IoW plans...But 73 stock availability keeps being pushed right...
Indeed currently 2023 which does fit any of the IoW plans...But 73 stock availability keeps being pushed right...
... and Bakerloo even later, but to the best of my knowledge it was never actually under as formal consideration as Piccadilly.Indeed currently 2023 which does fit any of the IoW plans...
as has been mentioned on here before...it's not just about static dimensions, but about throw as well, so you need to add a good 6-9 inches each side for clearance once the suspension starts bouncing around.Much of this thread is already about whether or not D78s will fit, links to various information sources have already been made suggesting they will fit.
Likewise Piccadilly stock has been routinely mentioned as the likely solution for quite a few years, not least in this thread, but also a few times by SWT, it came up in their web chats a couple of times. But 73 stock availability keeps being pushed right...
Slightly odd statement. I can only guess they mean the height of the pierhead roof. Which is easily solved by chopping it off- The Committee raised concerns regarding the pier and the height of the newer trains as there had been issues previously with them fitting under some of the tunnel and bridges.
SWR saying replacements within 2 years almost eliminates 72/73 deep tube stock from the equation.
72 stock is falling apart as it is and LU are having to spend a lot of money just to keep them going for another 10 years until they can be replaced. They won't be capable of turning a wheel once they leave the Bakerloo.
73 stock is in a better state, but indeed won't be available for at least 5 years, and what with being long cars, may not be appropriate indeed.
Slightly odd statement. I can only guess they mean the height of the pierhead roof. Which is easily solved by chopping it off
Would Class 313s fit? As these were designed to be lower to fit through the Moorgate tunnel.
I think that's just a slightly odd way of saying that they raised their concerns about the pier, and also about the height of the newer trains.
It seems the D78s do (more or less) but 313s are longer so would, at best, be a tighter fit through the tunnel, bridges on curves and the depot at Ryde while increasing the platform gap at Esplanade. Aside from gauging they are also heavier, more complex and in worse condition than the D78s.
73 stock is in a better state, but indeed won't be available for at least 5 years, and what with being long cars, may not be appropriate indeed.
With D stock at 3.62m height, Class 313 is 3.58m so not much more clearance. Class 455 units are only 3.77m, I'm surprised that these have not been mentioned as the first ones should be available in about 18 months or less.
Agree 230s, but not battery. There is a third rail to use!!The Island Line will use 230s (battery versions presumably) if they are going to use anything else.
Agree 230s, but not battery. There is a third rail to use!!
Agree 230s, but not battery. There is a third rail to use!!
The D Stock seems perfect for the Island line. Not sure why people are touting all these other units.
No where near as bad a alleged and plenty of easy fixes to some issues.It's knackered and needs replacing. Or, you could *not* replace it and save the money by using batteries?
I think the state and future of the DC power is regularly exaggerated. The actual conductor rail should last forever in railway terms given its light usage; except possibly for the bit along the pier. As we’ve discussed before DC substation equipment is still being routinely renewed or enhanced on the mainland, and I can’t see there’s anything special about the IOW that would prevent an order being tacked on.No where near as bad a alleged and plenty of easy fixes to some issues.
I'm no engineer, but batteries aren't free are they? You have to pay to charge them up, pay to drag them around, and pay to replace them every few years, AIUI...It's knackered and needs replacing. Or, you could *not* replace it and save the money by using batteries?
I'm no engineer, but batteries aren't free are they? You have to pay to charge them up, pay to drag them around, and pay to replace them every few years, AIUI...
I agree,, decommissioning it sounds as daft as the similar idea Chris Garnett once advocated for the OHLE north of Newcastle in his early GNER days.No where near as bad a alleged and plenty of easy fixes to some issues.
I'm no engineer, but batteries aren't free are they? You have to pay to charge them up, pay to drag them around, and pay to replace them every few years, AIUI...
But is easier to maintain than 10 or so miles of isolated 3rd rail. It allows for much easier track works in future i.e. reinstating the loop at Brading etc.
And with the regen type approach the batteries get some charge as the train brakes etc. And charging batteries is more energy efficient than having a 750v exposed rail permanently live for 10 miles.
I don’t see why maintaining the electrification is such an issue. Three tiny substations, a high-tension cable network from Ryde to Sandown, a tiny grid connection and a few miles of lightly used third rail. Surely thats got to be better than messing around with batteries or diesels.
I agree,, decommissioning it sounds as daft as the similar idea Chris Garnett once advocated for the OHLE north of Newcastle in his early GNER days.
Agreed. 3 x 3-car 230s would be ideal - two in service with a new Brading loop for a half hourly service, one spare.