Today the 0606 from marlow which is due to arrive in bourne end at 0613 went very slowly the entire journey arriving into bourne end at 0616 (although real train times says it arrived at 0613).
Now on the train bourne end to maidenhead which is going incredibly slow and likely to miss the connection to Paddington
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Reliablebeam

Member
Joined
14 Jun 2017
Messages
272
I had some fun and games with this on Sunday - we were told there was heat speed restrictions, very (dead) slow around the Cookham - Bourne End segment. I missed my connection on the way there for unrelated reasons as the 387 I was travelling on to Maidenhead lost overhead current - we were told that another train had tripped the power supplies...
 

Stephen1001

Member
Joined
7 May 2020
Messages
100
Location
Maidenhead
Ah, perhaps this explains what I observed very early in the morning on Friday 12 August: NR test train 3Q77, formed of top-and-tailed class 37s and various coaches, made an untimetabled trip up the Marlow branch at around 0040, returning an hour later (the RTT schedule doesn't show this as it wasn't in the plan). Given that its length would prevent it from reaching Marlow itself, and that - to my knowledge - there hasn't be a loco-hauled train up the branch since my family moved to Maidenhead in 2004, checking the track as far as Bourne End in abnormal conditions would seem a likely reason for this highly unusual working.

(Edit to correct typo in date!)
 
Last edited:

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,513
Location
Taunton or Kent
Is there still a permanent 10mph speed restriction over a particular level crossing? I imagine that potential journey time is held back by that particular restriction, whereby if it was removed a significant journey time improvement could be made relative to the overall journey time.
 

James H

Established Member
Joined
25 Jun 2014
Messages
1,547
Isn't all the track on the branch due to be relayed in October?
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
Ah, perhaps this explains what I observed very early in the morning on Friday 11 August: NR test train 3Q77, formed of top-and-tailed class 37s and various coaches, made an untimetabled trip up the Marlow branch at around 0040, returning an hour later (the RTT schedule doesn't show this as it wasn't in the plan). Given that its length would prevent it from reaching Marlow itself, and that - to my knowledge - there hasn't be a loco-hauled train up the branch since my family moved to Maidenhead in 2004, checking the track as far as Bourne End in abnormal conditions would seem a likely reason for this highly unusual working.

That’s interesting, in the past I believe the branch has been measured using hand-propelled equipment as it wasn’t included in the main track recording unit diagrams. This method does have its limitation as it doesn’t identify dynamic geometry faults that only become apparently under the weight of a train.

I would imagine the output traces / data from this run might be the root of the current ESR?
 

Jamiescott1

Member
Joined
22 Feb 2019
Messages
1,116
Is there still a permanent 10mph speed restriction over a particular level crossing? I imagine that potential journey time is held back by that particular restriction, whereby if it was removed a significant journey time improvement could be made relative to the overall journey time.
Yes there is. Gate crossing at spade oak
 