Should have also added there is a 50 limit through Burton. Case for realigning alla M Harborough ?I knew there was something between Derby and New Street, but I couldn’t remember if it was 125 or 100mph.
Should have also added there is a 50 limit through Burton. Case for realigning alla M Harborough ?I knew there was something between Derby and New Street, but I couldn’t remember if it was 125 or 100mph.
You could reverse the argument though and say that trains stop as they have to reduce from 125 to 50 anyway. If it was realigned so 125 could be maintained perhaps more would go through at 125 ?How many non stop trains per hour? Plus is the platform long enough for all full length trains? If most trains stop and the platforms are full length, it's harder to make a case I would guess.

Presumably the 50mph restriction is there because the tracks need to negotiate the island platform?
Would it be possible to rebuild the station with single platform faces on the outside of the four tracks instead of the island platform, allowing the tracks to be realigned, or would that cause issues with the structure(s) built on top of the station?
Probably a minute tops, its 50mph for only 34 chains.
Isn`t it more the case of the time taken to accelerate back to 125 from 50 and before that brake from 125 to 50 ? If that time was at the 125 I would think more than 1 minute would saved. Maybe others can shed light ?
Presumably there are still tools (and probably much better ones than in the past) for calculating costs and benefits. Wear-and-tear from additional braking and acceleration, extra fuel cost for getting back up from 50 to 125, and extra income generated by the 1-minute cut in journey-time? Back in the days of the EML electrification wasn't the rule-of-thumb that 1% off journey time meant 1% more in revenue?There’s various simple tools to calculate this. The one I have shows that for a 10 car Voyager, a 34ch speed restriction of 50mph in an otherwise 125mph stretch of track costs 66 seconds including acceleration and deceleration. In train planning terms that’s 1 minute.
Presumably there are still tools (and probably much better ones than in the past) for calculating costs and benefits. Wear-and-tear from additional braking and acceleration, extra fuel cost for getting back up from 50 to 125, and extra income generated by the 1-minute cut in journey-time? Back in the days of the EML electrification wasn't the rule-of-thumb that 1% off journey time meant 1% more in revenue?
Route Runner? you have too much time on your hands if you are playing about with thatThere’s various simple tools to calculate this. The one I have shows that for a 10 car Voyager, a 34ch speed restriction of 50mph in an otherwise 125mph stretch of track costs 66 seconds including acceleration and deceleration. In train planning terms that’s 1 minute.
Route Runner? you have too much time on your hands if you are playing about with that![]()
Normally down to catching up a Notts Cardiff service which is probably behind a crossing move at Water Orton and which then clashes with a Cross City at Proof House.One of the oddities of the XC timetable was (before the amended Covid timetable) that trains not booked to stop at Burton were timetabled to take longer between Birningham and Derby. (I'm referring to the long-distance, Voyager or HST trains, not the 170s).
When I've travelled on a non-stop train, it seems to catch up with something in front about Tamworth, and run on the block, but still arrives at Derby right time.
This may be relevant to the suggestion of improving the line speed through Burton for such trains...
I may be mistaken, but having lived in Burton until seven years ago, I thought there had been a partial realignment to increase the speed through the station a few years back. The other question that would affect any decision is the ongoing issue of reopening the line to Leicester for passenger service ... which seems to be on the agenda again.
Defiantly wide enough. Just have to knock down the National Forest in the middle to build it (it would make the station look better)!Looking on Google Earth the island platform looks wide enough for a bay platform to be built in the South for terminating Ivanhoe services from Leicester unless the service is extended to Derby to pick up stops at Willington and Peartree.
The north bay served the now-lifted line to Tutbury. I believe the south bay was for trains to Walsall via Lichfield. The Lichfield line still connects to the main line at Wychnor, and is used as an occasional diversionary route for XC services towards B'ham. Extending the Cross City line is new to me - it would presumably mean electrification, but would still be much slower than the direct route via Tamworth, unless they're counting on people wanting to travel between Burton and Lichfield/Sutton Coldfield.There were North and South facing bays although IIRC offset on the platform.
If you search on old maps for the area the more detailed one show
An advantage of a very high-performance unit with electric-like acceleration.planning terms that’s 1 minute.
With Voyagers, to save brake pad wear, much of the braking will likely be regen too, but the energy will be discharged as heat through the resistors on the roof. If they had some traction batteries on board, they could notionally capture some of that for use in acceleration out of the restriction, saving some emissions too.The fuel cost can be quite significant. For a restriction like this, at an educated guess, it would be in the region of £20 per non stop train. That’s about £1000/ day, £300k pa. The savings are much less on electrified railways where trains have regen braking.