Operators seem to want multiple units over loco hauled stock. TransPennine Express excepted.Cheaper to build new
And Newark North Gate!I've never known it be anything other than Leeds.
Back in the day there were not so many intermediate stops and fewer trains competing for paths so 140 mph running would have been feasible.. if they had invested in in cab signalling . Now there are so many services with intermediate stops it is hard enough to get a clean 125 mph path never mind a 140 mph one.I suspect with the new Azumas looming maintenance may be cut back a bit.
Shame there likely heading for scrap after never having used there 140mph capability except on test.
K
Ok I will rephrase that; it's only normally on the Leeds to London route (on which Newark is an intermediate station en route). Now I think about it I did once see* it on the York route.And Newark North Gate!
The 90s have better acceleration than the 91s so can just about keep to time on the Newark and leeds services.Yes the Newark stopping services seems to be the favourites for substituting a class 90 in place of the booked 91. Checking real-time trains suggest it is only the Stevenage to Peterborough section where the 90s lose time over the 91's or HST due to their 110mph limit. But there is some standing time at Peterborough on the down service. And unless it's really wet the average time loss seems to be between 3 to 5 minutes.
I must be lucky as in all my years of traveling the ECML I've never had a 225 set breakdown on me.
I will miss them awfully when they go.
A Class 90 hauled consist can accelerate to 4 miles in around 3.5 minutes around 20 to 30 seconds quicker than a 91, which is itself 5 to 10 seconds quicker than a 2+8 HST. A Class 350 or 360 EMU could better the Class 90's timing by a further 20 to 30 seconds! On the ECML, this is only a benefit on shorter station to station sections.The 90s have better acceleration than the 91s so can just about keep to time on the Newark and leeds services.
How much difference does it make compared to a 2+9, that being the East Coast formation since the early 2000s?5 to 10 seconds quicker than a 2+8 HST.
Thanks for that breakdown, very informative and easy to understand.A Class 90 hauled consist can accelerate to 4 miles in around 3.5 minutes around 20 to 30 seconds quicker than a 91, ...
Someone should tell that to Porterbrook and the 769s.Cheaper to build new
So much for a 'right time' railway!!I've caught these services from Wakefield Westgate a number of times recently and they are usually late going on to Leeds.
91s - minutes late
9, 14, 12, 1, 0, 16, 2, 3, 0, 17, 5, 2, 2, 19, 3, 41.
HSTs - minutes late
20, 10, 4, 4, 3, 3, 2, 0, 10.
90s - minutes late
26, 0, 14.
So all three can keep to time.