Ironbridge rail link

AlanL

Member
Joined
3 Sep 2019
Messages
67
Location
Wolverhampton
The Telford Steam railway have sent a message to all members to say that their long term plans to extend their line to Ironbridge have been stopped, as the rail line from Madeley Jnt to Buildwas (owned by NR) has now been leased to another company who are proposing to create a 'very light rail' link to Ironbridge using battery operated rail cars.

This would save significant money in reopening the line as major expensive repairs would have been necessary to restore heavy rail to the line.

Has anyone else heard anything about these plans? This seems to be a very interesting development!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
The Telford Steam railway have sent a message to all members to say that their long term plans to extend their line to Ironbridge have been stopped, as the rail line from Madeley Jnt to Buildwas (owned by NR) has now been leased to another company who are proposing to create a 'very light rail' link to Ironbridge using battery operated rail cars. This would save significant money in reopening the line as major expensive repairs would have been necessary to restore heavy rail to the line. Has anyone else heard anything about these plans? This seems to be a very interesting development!
The VLR concept is currently being trialled in Coventry: https://en.wikipedia.org/wiki/Coventry_Very_Light_Rail. It has seen much lower construction costs, but equally is much lower capacity. It is a bit of a gimmick and very much feels like it's trying to be a bus with the qualitative benefits of railed transport. However, that's a niche that could well have calls for in larger towns/small cities where outlying areas would be tempted by a high-quality bus.

There was also a demonstrations of a VLR railar in Ironbridge a few years ago: https://transportdesigninternational.com/portfolio/revolution-vlr/

I don't know how much work the VLR would save against just reopening the line as an RA5 passenger railway though. I suspect the works to the viaduct would have been similar, VLR's major construction costs savings have been focused on on-street sections so far.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,663
The VLR concept is currently being trialled in Coventry: https://en.wikipedia.org/wiki/Coventry_Very_Light_Rail. It has seen much lower construction costs, but equally is much lower capacity. It is a bit of a gimmick and very much feels like it's trying to be a bus with the qualitative benefits of railed transport. However, that's a niche that could well have calls for in larger towns/small cities where outlying areas would be tempted by a high-quality bus.

There was also a demonstrations of a VLR railar in Ironbridge a few years ago: https://transportdesigninternational.com/portfolio/revolution-vlr/

I don't know how much work the VLR would save against just reopening the line as an RA5 passenger railway though. I suspect the works to the viaduct would have been similar, VLR's major construction costs savings have been focused on on-street sections so far.
The viaduct is going to cost way more to remedy for heavy trains than a VLR. Its not in a good state.
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
The VLR concept is currently being trialled in Coventry: https://en.wikipedia.org/wiki/Coventry_Very_Light_Rail. It has seen much lower construction costs, but equally is much lower capacity. It is a bit of a gimmick and very much feels like it's trying to be a bus with the qualitative benefits of railed transport. However, that's a niche that could well have calls for in larger towns/small cities where outlying areas would be tempted by a high-quality bus.

There was also a demonstrations of a VLR railar in Ironbridge a few years ago: https://transportdesigninternational.com/portfolio/revolution-vlr/

I don't know how much work the VLR would save against just reopening the line as an RA5 passenger railway though. I suspect the works to the viaduct would have been similar, VLR's major construction costs savings have been focused on on-street sections so far.
The Coventry and Ironbridge VLRs are two entirely different technologies. Given proximity, I would imagine the Ironbridge one would be the likely contender for running the branch. This type is more train-like than the Coventry one; it looked to me like a functional equivalent of a class 153 (no similarity in construction, etc.!) but without meeting heavy rail crashworthiness standards.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,624
Location
Nottingham
The Coventry and Ironbridge VLRs are two entirely different technologies. Given proximity, I would imagine the Ironbridge one would be the likely contender for running the branch. This type is more train-like than the Coventry one; it looked to me like a functional equivalent of a class 153 (no similarity in construction, etc.!) but without meeting heavy rail crashworthiness standards.
Here's some more detail on Revolution railcar https://revolutionvlr.com/ and the Ironbridge project at https://revolutionvlr.com/working-in-partnership-to-deliver-rvlr/.
Revolution Very Light Rail (RVLR) is an innovative, lightweight, cost-effective rail vehicle that provides a compelling alternative to operating traditional heavy rail vehicles on branch lines. Its low mass reduces all aspects of operating costs and can significantly improve the business cases for line reopenings and extensions, enhancing local connectivity.
Planning and implementing the RVLR demonstration environment at Ironbridge led to more Eversholt Rail and TDI personnel joining the project. It also involved working closely with the team at Harworth Developments, the Ironbridge site owners, as well as with experienced rail infrastructure and other suppliers. From the outset, we emphasised the partnership aspects by using of ‘RVLR team’ messaging and branding throughout the stakeholder demonstration phase, which began in September 2021. This approach has attracted positive comments from stakeholder visitors, as has the recognition of project sponsors and original consortium members on the Demonstrator vehicle itself.

A significant early outcome from the Ironbridge demonstrations has been the strong relationship that the RVLR team built with Network Rail’s Light Rail and Restoring Your Railway teams. All parties recognised the mutual benefits that can result from working closely together to identify and prioritise RVLR deployment opportunities, and this has led to regular engagement to progress the most promising prospects.
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
A couple of pictures for those unfamiliar.

Revolution (Ironbridge system):
Revolution VLR demo.jpg

Coventry:
Coventry VLR.jpg

Clearly very different levels of 'lightness' and appropriate intended operating conditions (branch line or urban short-hop journey). If (as would be likely) the Revolution vehicle would run the Ironbridge branch, bridges, etc. would need to handle heavier vehicles than if the Coventry one were to run, albeit still less than traditional heavy rail.
 
Last edited:

Russel

Established Member
Joined
30 Jun 2022
Messages
5,425
Location
Lichfield
How likely is this light rail project to actually happen though?

Without wanting to sound negative, it's hardly the first time we've seen proposals like this...
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
That's the thing. Where would the vehicle go at the Telford end and who would it serve en route? I would expect most would want to go to Telford but the connection faces Shifnal. Could there be special permission to run the non-compliant vehicle on the main line? Even the nearly two miles to Shifnal? Or build a new station near the junction?
 
Last edited:

Russel

Established Member
Joined
30 Jun 2022
Messages
5,425
Location
Lichfield
That's the thing. Where would the vehicle go at the Telford end and who would it serve en route? I would expect most would want to go to Telford but the connection faces Shifnal. Could there be special permission to run the non-compliant vehicle on the main line? Even the nearly two miles to Shifnal? Or build a new station near the junction?

The idea of building a new station, to me, makes this a non starter...

I would love to be proven otherwise though!
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
That's the thing. Where would the vehicle go at the Telford end and who would it serve en route? I would expect most would want to go to Telford but the connection faces Shifnal. Could there be special permission to run the non-compliant vehicle on the main line? Even the nearly two miles to Shifnal? Or build a new station near the junction?
To me the VLR concept only has any useful application if the vehicles can be authorised on to the mainline for short stretches such as to reach a bay at a useful interchange station. Otherwise they're just another gadgetbahn.
The idea of building a new station, to me, makes this a non starter...

I would love to be proven otherwise though!
Opening a small single platform on a former siding is not a particularly unrealistic proposal. The business park wouldn't give that much traffic but perhaps if it was a Parkway station which could also be served by Birmingham-Bound trains it might make a case.

For me the bigger problem is that the railway line was followed by the dual carriageway, and therefore the (fairly low-density) housing is not particularly close to the rail corridor and journey times would be uncompetitive against direct private vehicle routing.
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
Could there be special permission to run the non-compliant vehicle on the main line? Even the nearly two miles to Shifnal? Or build a new station near the junction?
Almost certainly not, no. That is the whole point of VLR, it will only run where all the safety standards associated with the real railway don't apply. The likelihood of standards being reduced, after decades of nothing but standards becoming more restrictive, is nil.
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
Almost certainly not, no. That is the whole point of VLR, it will only run where all the safety standards associated with the real railway don't apply. The likelihood of standards being reduced, after decades of nothing but standards becoming more restrictive, is nil.
To me the VLR concept only has any useful application if the vehicles can be authorised on to the mainline for short stretches such as to reach a bay at a useful interchange station. Otherwise they're just another gadgetbahn.
I agree (my questions were supposed to be rhetorical). Promoters will need to solve the 'where does it go' issue one way or another if it will serve any practical use whatsoever.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,663
When did Ironbridge cease to be part of the network?
It still is, though nothing has ran down there in anger since the power station closed. Its effectively out of use.

This train will not end up on the heavy rail network at all.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,624
Location
Nottingham
Almost certainly not, no. That is the whole point of VLR, it will only run where all the safety standards associated with the real railway don't apply. The likelihood of standards being reduced, after decades of nothing but standards becoming more restrictive, is nil.
In principle the process applicable to tram-trains could be followed, which mandates a risk assessment and TPWS protection at every signal may be a suitable mitigation.
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,961
Location
here to eternity
The Telford Steam railway have sent a message to all members to say that their long term plans to extend their line to Ironbridge have been stopped, as the rail line from Madeley Jnt to Buildwas (owned by NR) has now been leased to another company who are proposing to create a 'very light rail' link to Ironbridge using battery operated rail cars.

This would save significant money in reopening the line as major expensive repairs would have been necessary to restore heavy rail to the line.

Has anyone else heard anything about these plans? This seems to be a very interesting development!

Thread reopened for an update from @overthere 2
 

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,940
Location
Telford
The current plan is to go from Doseley to Lightmoor Junction where the VLR will take passengers from their to Ironbridge. There has been talks of a contract between VLR and NR however, we don't now if said contract has been signed by the two parties.

== Doublepost prevention - post automatically merged: ==

It still is, though nothing has ran down there in anger since the power station closed. Its effectively out of use.

This train will not end up on the heavy rail network at all.
2019 was the last time any train used the branch line. It was Clun Castle on a railtour.
 
Last edited:

overthere 2

On Moderation
Joined
25 Apr 2024
Messages
67
Location
london
How likely is this light rail project to actually happen though?

Without wanting to sound negative, it's hardly the first time we've seen proposals like this...


A first step?




Telford eyes metro-style rail network for town link​

10 August 2026 14:10Mike SheridanComments (0)

All-electric metro trains could be coming to Telford, with the local authority considering spending £150,000 on developing a link between Telford Central and Ironbridge.

Telford & Wrekin Council’s Very Light Rail project was unveiled as part of a transport strategy which went out for consultation this month.

The metro, which is similar to an existing project being trialled in Coventry, would connect the tourist hotspot of Ironbridge Gorge with Telford’s town centre – but could be extended to serve other destinations across the borough.

Link to draft transport strategy and consultation survey here: www.telford.gov.uk/roadworks-transport-and-streets/local-transport-plan/


While I haven't read each of the key consultation documents in the link above thoroughly word for word something that did catch my eye was about the VLR that the: "Approximate scheme delivery timescale is post 2030".

Now I appreciate they have to scope out station's sites, though surely to start off with they could build basic stations out of scaffolding to assess demand? and it takes time to sort paperwork etc but from what I gather the VLR has been testing for at least five years so any issues should have been ironed, out the track is fully maintained by Network Rail and ready to go and it is a branch from the network to a dead end so a long as - is most likely - you just have one unit shuttling up and down then there should be no need for signalling as it would be "One engine in steam".

So why on earth are we looking at at least 2030 onwards to get the whole thing up and running?
 

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,940
Location
Telford
A first step?









Link to draft transport strategy and consultation survey here: www.telford.gov.uk/roadworks-transport-and-streets/local-transport-plan/


While I haven't read each of the key consultation documents in the link above thoroughly word for word something that did catch my eye was about the VLR that the: "Approximate scheme delivery timescale is post 2030".

Now I appreciate they have to scope out station's sites, though surely to start off with they could build basic stations out of scaffolding to assess demand? and it takes time to sort paperwork etc but from what I gather the VLR has been testing for at least five years so any issues should have been ironed, out the track is fully maintained by Network Rail and ready to go and it is a branch from the network to a dead end so a long as - is most likely - you just have one unit shuttling up and down then there should be no need for signalling as it would be "One engine in steam".

So why on earth are we looking at at least 2030 onwards to get the whole thing up and running?
The Albert Bridge needs fixing and costs too much money is one thing. The line itself probably needs looking at because nothing has used it recently in the last 5 years or so. We (the Telford Steam Railway) still need to know about if a contract has been signed or not. Perhaps putting the third piece of the triangle in at Madley Junction would be a start rather than have to do reversing movements on the mainline. Many things to factor in.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,663
The Albert Bridge needs fixing and costs too much money is one thing. The line itself probably needs looking at because nothing has used it recently in the last 5 years or so. We (the Telford Steam Railway) still need to know about if a contract has been signed or not. Perhaps putting the third piece of the triangle in at Madley Junction would be a start rather than have to do reversing movements on the mainline. Many things to factor in.
Nothing will be connected to the mainline.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
Well if said train is going to Telford Central that is on the mainline.
I thought a significant part of the VLR's cost saving was that it didn't need to meet mainline crashworthiness and protection system requirements? If so, how will the VLR jump through the ORR and NR's approval hoops to run on the mainline with regular services?
 

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,940
Location
Telford
I thought a significant part of the VLR's cost saving was that it didn't need to meet mainline crashworthiness and protection system requirements? If so, how will the VLR jump through the ORR and NR's approval hoops to run on the mainline with regular services?
I mean I could be wrong but that's what I thought was happening.
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,399
I thought a significant part of the VLR's cost saving was that it didn't need to meet mainline crashworthiness and protection system requirements? If so, how will the VLR jump through the ORR and NR's approval hoops to run on the mainline with regular services?
If the VLR doesn't go to Telford Central, it will be a Very Lightly-used Railway, going round the centre of Telford but never touching the centre where the jobs, shops and entertainment are. As it is, the route is a long way round and is hardly convincing as a practical means of transport.
 