All 22000 are to be changed to all 3 and 4 coach trains by the end of the year to match capacity and demand and to say costs.
The 15 6 car sets (10 first class and 5 high capacity) will have two coaches removed to being them down to 4 car sets.
All these coaches will be used to increase 3 car sets to 4 car sets.
Provided trails and software changes work and they operate normally, by early 2014 at the latest the fleet will be 10 4 car (first class) trains, 35 4 car trains and 18 3 car trains.
Also Mark 4's will operate very few Cork services in the near future to cut costs.
The 15 6 car sets (10 first class and 5 high capacity) will have two coaches removed to being them down to 4 car sets.
All these coaches will be used to increase 3 car sets to 4 car sets.
Provided trails and software changes work and they operate normally, by early 2014 at the latest the fleet will be 10 4 car (first class) trains, 35 4 car trains and 18 3 car trains.
Also Mark 4's will operate very few Cork services in the near future to cut costs.