I am familiar with the intermediate token machine but how are intermediate sidings operated with the other forms of working?

is there a release in both adjacent boxes or is one deemed the controlling box?

I have heard of such intermediate sidings on tokenless block lines and their working on this website but what do such an instrument look like at the intermediate siding? does anyone have photos?

any insight on these intermediate sidings would be appreciated.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

P Binnersley

Member
Joined
30 Dec 2018
Messages
533
There are details here of the new control being fitted for Foley Park Ground Frame on the Severn Valley Railway. It is between Kidderminster and Bewdley in a single line acceptance leave section.

Currently it is released by a Possession Key so can only be used when the signal boxes are closed.
 

Belperpete

Established Member
Joined
17 Aug 2018
Messages
3,676
The ground frame will come under the control of one of the signalboxes - that will be the signalbox the person operating the ground frame will liaise with.

With absolute block, the usual arrangement is for the controlling signalbox to release the ground frame, either mechanically or electrically. The ground frame would normally have an indication of the release, but no block indication. The controlling signalbox would be responsible for sending the appropriate bell codes to the signalbox at the other end of the section for trains entering or exiting the siding.

With the various forms of single line control, the release will depend on whether or not trains can shut in. In the simple case where trains can't shut in, all that is usually needed is authority to use the ground frame for shunting. In some cases this can be purely verbal, in some cases the controlling signalbox gives an electrical release. It was common to provide a track circuit, so that the ground frame could only be operated once the train had arrived at it. If trains can shut in, the ground frame will also need to be released by the block controls, so that the ground frame can't be released to let a train out into an already occupied section. However, that doesn't mean that a block instrument will be provided at the ground frame. As at Foley Park, a simple two position needle indicator is all that is usually provided to show that the ground frame is free to be used or not.

Note that there were at least four different versions of tokenless block (WR, SR, ScR, and BR). Likewise there were regional variations on how things like direction and acceptance lever controls were implemented. So I can only generalise, there are likely to be many variations.

For example, Foley Park has an Annetts key instrument for releasing the ground frame. The Western tended to favour Annetts key releases on ground frames, whereas some other regions tended to provide an electric lock direct on the ground frame lever rather than provide an Annetts instrument.
 
Last edited:

High Dyke

Established Member
Joined
1 Jan 2013
Messages
5,019
Location
Yellabelly Country
In an Absolute Block area then a ground frame may be released from the nearest controlling signalbox. Ancaster used to be like that, the siding was in station limits and the frame was electrically released.
 