elementalpat
Member
- Joined
- 7 Nov 2011
- Messages
- 81
Jusat saw these entires on the SWT journeycheck
11:39 London Waterloo to Poole due 14:55
This train will be delayed and is expected to be 848 minutes late from Totton.
This is due to signalling problems.
Message Received :10/12/2011 14:09
12:05 London Waterloo to Weymouth due 15:00
This train has been delayed by up to 13834 minutes and is expected to run as shown below.
This train will be terminated at Dorchester South at 05:22.
This train will no longer call at New Milton, Christchurch, Pokesdown, Upwey and Weymouth.
This is due to earlier signalling problems.
Message Received :10/12/2011 14:34
I've had some big delays before, but this is taking the biscuit!
11:39 London Waterloo to Poole due 14:55
This train will be delayed and is expected to be 848 minutes late from Totton.
This is due to signalling problems.
Message Received :10/12/2011 14:09
12:05 London Waterloo to Weymouth due 15:00
This train has been delayed by up to 13834 minutes and is expected to run as shown below.
This train will be terminated at Dorchester South at 05:22.
This train will no longer call at New Milton, Christchurch, Pokesdown, Upwey and Weymouth.
This is due to earlier signalling problems.
Message Received :10/12/2011 14:34
I've had some big delays before, but this is taking the biscuit!
(and no I won't moan at the driver/conductor about it being his fault!)