Because it is scrappedWith so much talk of the Manchester arm being safe, we haven't heard much in recent weeks of whether that includes the Wigan arm.
Because it is scrappedWith so much talk of the Manchester arm being safe, we haven't heard much in recent weeks of whether that includes the Wigan arm.
Why would it be scrapped? I’ve not heard that anywhere.Because it is scrapped
To save a couple of billion - hints have been dropped by Shapps that it will go for some time nowWhy would it be scrapped? I’ve not heard that anywhere.
To save a couple of billion - hints have been dropped by Shapps that it will go for some time now
I have seen 10-13 minutes savings been quotedHow much time does that save to Scotland compared with going classic line from Crewe?
I'm still trying to piece together which bits of the NIC report shopping list the government are going for. Regional+25, with an added Clayton spur and no(?) ECML upgrade perhaps.If the FT story is true, strikes me as actually quite a clever solution. Build the bit of TRU around Huddersfield for some early benefits release and then connect part of NPR into it from the Manchester end**. Then the TRU work (which is hardly cheap) isn't abortive. And you've joined up the capacity elements of both, with a decent dent in Manchester-Leeds journey times.
An "Integrated" form of "Plan", one might say, for "Rail" services.
**Think of it as a super-duper version of the Micklehurst loop perhaps.
I have seen 10-13 minutes savings been quoted
If this is true, then that largely solves the freight question. A new tunnel would presumably be built to at least UIC (or even double-stacking capable) bore. Freight would avoid all but minor bridges east of Huddersfield towards Wakefield and then hull which are mostly being rebuilt anyway.If the FT story is true, strikes me as actually quite a clever solution. Build the bit of TRU around Huddersfield for some early benefits release and then connect part of NPR into it from the Manchester end**. Then the TRU work (which is hardly cheap) isn't abortive. And you've joined up the capacity elements of both, with a decent dent in Manchester-Leeds journey times.
An "Integrated" form of "Plan", one might say, for "Rail" services.
**Think of it as a super-duper version of the Micklehurst loop perhaps.
Is the Huddersfield-Ravensthorpe upgrade being built to GC gauge? If this forms part of the "new" "high-speed" line across the Pennines, that would make sense in my opinion. But I haven't heard anything about GC gauge, so I suspect it isn't.If this is true, then that largely solves the freight question. A new tunnel would presumably be built to at least UIC (or even double-stacking capable) bore. Freight would avoid all but minor bridges east of Huddersfield towards Wakefield and then hull which are mostly being rebuilt anyway.
Chief political correspondent of the FT now sawing that there WON'T be a high speed line between Leeds and Sheffield, only Birmingham to EMP but NPR will be a new line from Manchester to Huddersfield then upgraded line to Leeds.
Is the Huddersfield-Ravensthorpe upgrade being built to GC gauge? If this forms part of the "new" "high-speed" line across the Pennines, that would make sense in my opinion. But I haven't heard anything about GC gauge, so I suspect it isn't.
The upgraded section almost certainly won't be - so it will eventually have to be rebuilt later.
I’m not convinced.So that 20 mile line between Leeds & somewhere north of Sheffield is nonsense?