TheJRB
Established Member
When the Inner South London line becomes part of London Overground's East London Line (the length between Queens Road Peckham and Wandsworth Road) next year, it looks as though most Southern services will be removed, partly to divert traffic for construction works at London Bridge.
This must surely mean a much smaller demand for the Class 456 fleet. Does anybody know if this is true and if so what will happen these trains?
This must surely mean a much smaller demand for the Class 456 fleet. Does anybody know if this is true and if so what will happen these trains?