At the moment as we know rail services have been significantly cut back. But there is a silver lining. I live on the Coventry-Birmingham line, and the local trains recently had a dreadful record of cancellations,station skipping, turning round short of the destination, significant delays and so on.
But now, on our cut back services, virtually everything is on time or only a bit late, and no cancellations at all. (Even if the trains only run with a handful of passengers).
Is it too much to hope that as the services increase, the planners will develop from this well working system and devise new timetables that are more than a work of fiction ?
Trains like the (nearly) all stations from Euston to Liverpool often turned round short at Liverpool Parkway, and those to Rugeley TV often only made it as far as Hednesford and frequently sk These complex timetables were bound to cause big difficulties.
Lets hope that the new schemes don't just reintroduce the old problems.
And no doubt this goes across the system.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WestRiding

Member
Joined
21 Mar 2012
Messages
1,014
This just goes to prove that the emphasis should be on longer, less frequent trains. Taking Sheffield for example, its running near perfect at the moment. So just lengthen the trains.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,674
The timetables will eventually come back exactly as they were. No one is re-writing them. It isn't exactly surprising that less train interacting with each other causes better punctuality!
 

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,206
This just goes to prove that the emphasis should be on longer, less frequent trains. Taking Sheffield for example, its running near perfect at the moment. So just lengthen the trains.

Yet if you want people to make a modal shift to public transport to hit carbon neutral targets, fast and frequent services are necessary.
 

PeterC

Established Member
Joined
29 Sep 2014
Messages
4,772
Yet if you want people to make a modal shift to public transport to hit carbon neutral targets, fast and frequent services are necessary.
I would add RELIABLE to that which is the the factor that the OP is complaining about.
 
Joined
24 Sep 2017
Messages
314
Punctuality will also be improved at the moment by fewer passenger issues, although the reduced frequency will still be the main contributor.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,759
At the moment as we know rail services have been significantly cut back. But there is a silver lining. I live on the Coventry-Birmingham line, and the local trains recently had a dreadful record of cancellations,station skipping, turning round short of the destination, significant delays and so on.
But now, on our cut back services, virtually everything is on time or only a bit late, and no cancellations at all. (Even if the trains only run with a handful of passengers).
Is it too much to hope that as the services increase, the planners will develop from this well working system and devise new timetables that are more than a work of fiction ?
Trains like the (nearly) all stations from Euston to Liverpool often turned round short at Liverpool Parkway, and those to Rugeley TV often only made it as far as Hednesford and frequently sk These complex timetables were bound to cause big difficulties.
Lets hope that the new schemes don't just reintroduce the old problems.
And no doubt this goes across the system.

Quite a lot of work has been done to analyse what has caused the performance improvement. There are a lot of factors, but probably the main one is that it’s a lot easier to run a reliable train service when you have nearly twice the amount of resource that would normally be required to do it. Cancellations due to traincrew shortages or rolling stock shortages have simply not happened.

Which leads to another conclusion: the base timetables are remarkably sound, it is the resourcing of them that is the problem.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,129
Surely the lack of passengers is a massive factor. No faffing around as people board or alight must have a positive impact.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,759
Surely the lack of passengers is a massive factor. No faffing around as people board or alight must have a positive impact.

That too. There’s about a dozen factors. I’m sure the work will come out in good time.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
a) lots of the services are run by LNWR, not famed for greatness on the WCML right now
b) Coventry station is currently being rebuilt, this may introduce delays at Coventry due to station work.
c) HS2 will relieve lots of trains of the WCML, more of the Avanti services will stop at Coventry and hopefully it should allow for upgrades like ETCS L2.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,674
a) lots of the services are run by LNWR, not famed for greatness on the WCML right now
b) Coventry station is currently being rebuilt, this may introduce delays at Coventry due to station work.
c) HS2 will relieve lots of trains of the WCML, more of the Avanti services will stop at Coventry and hopefully it should allow for upgrades like ETCS L2.
Coventry works don't affect the running of trains and all apart from one Avanti train stops at Coventry anyway. Resignalling is probably a good 25-30 years away along there.
 

London Trains

Established Member
Joined
9 Oct 2017
Messages
1,220
c) HS2 will relieve lots of trains of the WCML, more of the Avanti services will stop at Coventry and hopefully it should allow for upgrades like ETCS L2.

Actually less trains will stop at Coventry. Currently there are 3tph Avanti and apart from one in the morning peak, everything stops. After HS2 there will only be 2tph due to less demand from Brum.
 
Status