eastdyke
Established Member
Exactly... So why even try run them through Sheffield.
Only some, not all will route Sheffield. Sheffield is the fifth largest city in the whole of the UK.
Exactly... So why even try run them through Sheffield.
Only some, not all will route Sheffield. Sheffield is the fifth largest city in the whole of the UK.
And although born in East Anglia, I like Sheffield a lot. Especially Kelham Island (Fat Cat)!!Sorry my comment should state on the existing network. I am not arguing that Sheffield shouldn't get HS2. I am born and bred there.
You have absolutely no idea what frequency, capacity and demand will be like between Sheffield and Derby 14 years from now.
So HS2 have announced that Sheffield Station will be a stop on HS2 using existing rail tracks.
However it was my understanding that Sheffield was near to capacity and of course for HS2 the station will need to be extended.
Does Sheffield Station have the capacity for extra trains or could Sheffield be looking at a reduction of services?
No harm in guessing though.
I don't think any HS2 trains will terminate Sheffield. They will all be too and from further north.
I will guess that there will still be at the very very least 2 direct services an hour to Leicester. I foresee no situation in which this goes down.
There will also need to be at least two truly fast (and probably therefore non-stop) services an hour from Leicester to London, as this flow will not gain from HS2.
Now, who was talking about Kettering, Wellingbrough, Bedford and Luton?
On weekdays, there are only 4 trains from Sheffield that call at Kettering and Wellingbrough, all of them before 0700 and one of them overtaken. The 1549 and 1649 call at Kettering, but nowhere else, between Leicester and London.
There is just one single train to Bedford - the 0600, and one to Luton, the 1629. The 0530 and 0600 call at Luton Airport Parkway.
Market Harborough was not mentioned, but the 0530 and 0724 call there.
I rather doubt anyone would even notice at all if those were cut, much less complain!
As it stands the proposal is for two HS2 trains per hour to terminate at Sheffield. It does not include any connection further north for trains via Sheffield to re-join HS2 towards Leeds or York. From an HS2 point of view the Sheffield proposal makes sense without this connection.
They do discuss a northern connection in their report and there are some advantages from being able to run HS2 services through Sheffield. However the main benefit would be realising the Northern Powerhouse Rail target of 30min Sheffield-Leeds journeys. Therefore they are basically leaving NPR to pursue (and presumably to pay for) the connection and the necessary electrification between it and Sheffield.
It looks like there might be room for a pair of terminating platforms at Meadowhall. HS2 trains could thus continue on through Sheffield Midland station to terminate at Meadowhall and avoid long dwells at Midland. That might avoid any need for extra platforms and would deliver a regional parkway station after all, as well as the desired city centre access. Some trains might also continue on through Sheffield to Leeds via the suggested additional connection back onto the HS line, also with minimal dwells at Sheffield.
As others have already mentioned, hs2 services could run through to avoid the need for new platforms. I think the much bigger issue is fitting the number of trains in on the approaches from the south and north. Therefore, I think the following should be implemented.
Remodelling of the junction between the Hope Valley and MML at Dore to avoid flat crossings as well as quadruplling to boost capacity. I think the difficulty is what shape quadrupling should take. Running the MML and Hope Valley Line as separate two track railways from Sheffield station itself will reduce conflicts but would make it harder to reopen stations and introduce new stopping services. Perhaps creating 3 platforms at Dore on the hope valley line would allow trains that currently terminate in Sheffield to run through providing a stopping service to reopened stations and reducing the time trains are waiting in Sheffield thus freeing up capacity.
At the northern end, adding an extra track to separate the Worksop line from other traffic would reduce all conflicts upto Meadowhall but will be difficult and expensive to engineer. After this a flyover to allow southbound traffic from the Hallam Line to avoid flat crossings at Meadowhall and increasing Meadowhall station to 4 platforms on the Doncaster line should provide a significant boost to capacity.
I agree that extending the service to Meadowhall would free up scarce platform capacity at Sheffield. It would also address the issues raised by the pro-Meadowhall lot (ie good access from the M1 etc). However, as Grimsby Town has alluded to, it uses up capacity north of Sheffield. You would have two paths per hour in each direction, plus two conflicting moves (as terminating services cross the line towards Sheffield in order to access their platform. You are also a bit constrained for concourse space, as there is a massive (and presumably expensive-to-move) substation immediately adjacent to the existing station. With the current situation, I'm not sure that's tenable. So...
I agree that separating out the Worksop tracks is getting more and more critical. It would be a heavy piece of engineering (widening the cutting between Gibert Street and Cricket Inn Road, and replacing a number of bridges in the process). However, this is over a small area, and the disruption will be concentrated. Maybe once the works are complete, tunnellising the resulting 4-track section to give land back to the owners (and reduce noise) might be suitable compensation.
Another shot in the arm for capacity would be 4-tracking between Swinton and Rawmarsh, to separate Doncaster and Wakefield flows. Cross-Country services via Donny would stop at Rotherham Central (surely this is large enough to deserve an XC service?), while slow trains to Wakefield/Leeds would either bypass Rotherham or use Rotherham Masborough station. Interchange between the two would be available using either Swinton or Meadowhall stations.
I would also want to see Sheffield-Dore 4-tracked. By simplifying the Sheffield-Chesterfield corridor, freeing up paths and reducing conflicting moves, this would make the world of difference. It would also give you the chance to put in a local railway station (on the new "slows") somewhere between Sheffield and Dore, which might be useful.
I would also want to see Sheffield-Dore 4-tracked. By simplifying the Sheffield-Chesterfield corridor, freeing up paths and reducing conflicting moves, this would make the world of difference. It would also give you the chance to put in a local railway station (on the new "slows") somewhere between Sheffield and Dore, which might be useful.
Was the Sheffield - Dore section four track at one stage?
Yes, with four-platform stations at Heeley, Millhouses & Beauchief as well as Dore & Totley itself.