syorksdeano
Member
- Joined
- 7 Jan 2011
- Messages
- 779
So HS2 have announced that Sheffield Station will be a stop on HS2 using existing rail tracks.
However it was my understanding that Sheffield was near to capacity and of course for HS2 the station will need to be extended.
Does Sheffield Station have the capacity for extra trains or could Sheffield be looking at a reduction of services?
However it was my understanding that Sheffield was near to capacity and of course for HS2 the station will need to be extended.
Does Sheffield Station have the capacity for extra trains or could Sheffield be looking at a reduction of services?