Increasing 165/0 speeds - possible?

Status
Not open for further replies.
Joined
9 Dec 2023
Messages
584
Location
High Wycombe
What upgrades would be needed to hypothetically upgrade the 165/0s to a max speed of 90mph? I imagine new bogies and engines and other things. AFAIK they’re not that different to the /1s, so I can’t see any reason why it’s wouldn’t be possible or beneficial.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
It can be done. They’d need the yaw dampeners fitted but the brackets are already there.

I’m not sure if it’s related to tripcock being fitted or just NSE cheaping out, the Chiltern mainline was max 75mph when they were ordered.
 

JLH4AC

Member
Joined
15 Jul 2023
Messages
184
Location
Market Rasen
165/1s are regeared and fitted with bogie yaw dampers, this in theory could be done to 165/0s but given that there are many lines that would benefit from Networkers yet has line speeds of 75 or below it is likely not worth it.
 
Last edited:
Joined
9 Dec 2023
Messages
584
Location
High Wycombe
I’m doing a fictional yet realistic chiltern timetable improvement project thing and having them be able to run at 90mph would be massively beneficial, even if it wasn’t the whole fleet.

165/1s are regeared and fitted with bogie yaw dampers, this in theory could be done to 165/0s but given that there are many lines that would benefit from Networkers yet has line speeds of 75 or below it is likely not worth it.
There’s definitely some parts of the Amersham - Aylesbury line which could have their line speeds increased
 

philosopher

Established Member
Joined
23 Sep 2015
Messages
1,513
I’m doing a fictional yet realistic chiltern timetable improvement project thing and having them be able to run at 90mph would be massively beneficial, even if it wasn’t the whole fleet.


There’s definitely some parts of the Amersham - Aylesbury line which could have their line speeds increased
To me, this would have been a good idea to do 10 or 20 years ago. However given the 165/0’s are ageing now, it would be better to procure 90 or 100 mph capable new stock now.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,246
Wouldn't regearing impact their acceleration though, which might be an issue on the track shared with the Metropolitan Line?
 

JLH4AC

Member
Joined
15 Jul 2023
Messages
184
Location
Market Rasen
There’s definitely some parts of the Amersham - Aylesbury line which could have their line speeds increased
That can be said about a lot of lines. Based on what I have read about Amersham - Aylesbury line meaningful increases to its line speed would involve major track reengineering and the tripcock system (Reportedly it is unsuited for speeds much higher than 60 mph) being replaced.
 

Speed43125

Member
Joined
20 Jul 2019
Messages
1,172
Location
Dunblane
I'm sure I've read that the tripcock equipment for running on the LU tracks lives where the yaw dampers would go and the 2 systems are effectively incompatible as a result.
 