Virgin Trains has published an ORR report on its web site compiled by Chris Gibb who has been working with Network Rail on improving the performance of WCML South, which continues to be well below acceptability.
http://www.rail-reg.gov.uk/upload/pdf/wcs-reliability-programme-191112.pdf
It's a really good analysis of some deep-rooted problems, with interesting solutions identified.
The problems include a high level of suicides, neutral section problems, difficult access to the Up Fast in particular, and NR's procurement policies actually working against long-term solutions.
The ORR's attitude of fines and enforcements is considered unproductive, given the deep-seated nature of the problems.
The recommended solutions include fencing to HS1 standards, deploying a rail-mounted maintenance train, and running LM/SN trains on the DC lines between Willesden and Watford on weekend nights to enable the power to be turned off on the main lines for urgent maintenance.
This is an extract regarding neutral sections:
It shows what a tough job the guys in orange suits have to keep the WCML running.
http://www.rail-reg.gov.uk/upload/pdf/wcs-reliability-programme-191112.pdf
It's a really good analysis of some deep-rooted problems, with interesting solutions identified.
The problems include a high level of suicides, neutral section problems, difficult access to the Up Fast in particular, and NR's procurement policies actually working against long-term solutions.
The ORR's attitude of fines and enforcements is considered unproductive, given the deep-seated nature of the problems.
The recommended solutions include fencing to HS1 standards, deploying a rail-mounted maintenance train, and running LM/SN trains on the DC lines between Willesden and Watford on weekend nights to enable the power to be turned off on the main lines for urgent maintenance.
This is an extract regarding neutral sections:
All 125mph neutral sections are to be changed to the so-called Red Label Arthur Flurry neutral section. The manufacturer claims to have recommended this in 2008, but NR cannot trace such a request, and also claims the current Yellow Label version was never intended for 125mph operation. It appears that the West Coast Route Modernisation project team were more focussed on within budget / on time delivery of the project, than the medium / long term component performance, and this approach has clearly cost NR and the industry dearly in terms of poor performance.
It shows what a tough job the guys in orange suits have to keep the WCML running.