My impression is the said stretch of railway is congested and full of bottlenecks most of the time, not helped by Southeastern trains often needing to cross between pairs of tracks in the 4 track stretches, while Shepherd's Lane Jct and Nunhead Jct at each end having low speeds on one of the common divergences.
The Overground and Thameslink services appear to work on the basis that, between Peckham Rye and Loughborough Jct/Clapham High street, they normally stay on the same running lines throughout. However Southeastern and freight services have to crossover at least once.
Among ways I think this could be improved; Nunhead Jct should be remodelled to allow trains to/from Lewisham to enter and clear the junction faster (currently 20mph I believe), while trying to maintain the current speed for Catford routed services. If it's possible to reduce the length of or eliminate the 20mph restriction on the non-flyover route from Shepherd's Lane jct to Denmark Hill, then perhaps some SE services would not have to crossover between Peckham Rye and Denmark Hill. This would be most effective with down services considering Brixton station is by the flat jct.
If it was possible to go a bit more extreme, Nunhead could be expanded to 4 platforms, or at least 4 tracks at this point, to allow the possibility of overtaking stoppers (especially in the peak). If the 20/30mph restriction on the down line between Nunhead and Crofton Park has a braking impact over Nunhead Jct, then removing this will also speed up train passage through here.
The Overground and Thameslink services appear to work on the basis that, between Peckham Rye and Loughborough Jct/Clapham High street, they normally stay on the same running lines throughout. However Southeastern and freight services have to crossover at least once.
Among ways I think this could be improved; Nunhead Jct should be remodelled to allow trains to/from Lewisham to enter and clear the junction faster (currently 20mph I believe), while trying to maintain the current speed for Catford routed services. If it's possible to reduce the length of or eliminate the 20mph restriction on the non-flyover route from Shepherd's Lane jct to Denmark Hill, then perhaps some SE services would not have to crossover between Peckham Rye and Denmark Hill. This would be most effective with down services considering Brixton station is by the flat jct.
If it was possible to go a bit more extreme, Nunhead could be expanded to 4 platforms, or at least 4 tracks at this point, to allow the possibility of overtaking stoppers (especially in the peak). If the 20/30mph restriction on the down line between Nunhead and Crofton Park has a braking impact over Nunhead Jct, then removing this will also speed up train passage through here.