Under the current system, no speeds can be set, as the braking performance differs considerably between different train types.
When the positioning of the signals in track circuit block areas is being done, careful consideration of numerous variables are taken into account, including but not limited to:
- Maximum/permitted line speed,
- Gradient of the line,
- Breaking performance of the worse case type of train type that is permitted to use the line,
- The maximum number of trains that are planned to use the line,
- The position of signals in relation to junctions, so that there is sufficient distance for the overlap before the points,
- Positions of signals to stations if all passenger trains are planned to stop at these stations.
Permanent and junction speed restrictions may also be taken into account.
The overall result is that drivers are always given sufficient warning (yellow or double yellow aspect) so that they have sufficient service braking distance before arriving at a signal displaying a red aspect.
For trains (modern passenger) that have much better brakes than older train designs, a differential (maximum/permitted) line speed may be used. That is, the trains with better braking performance have a higher line speed compared to other trains.
Approach release (approach control) for junction signals is done on a combination of either the track circuit (or axle counter or other train detection device) detecting the train, or that plus a timer. It’s a compromise, as the signalling has no way to know what type of train is present, so it has to work for all trains.
TPWS and TPWS+ installations are also a compromise for the same reasons. They have to be installed to take account of trains with traditional braking performance, hence drivers of modern trains with better brakes have to drive defensively otherwise they risk tripping it and coming to an embarrassing (to some) halt in the middle of nowhere.