BR had a dual-sourcing policy after BREL was privatised, but that didn't necessarily work too well.
There were problems with one or other of the split fleets for Super Sprinters (155/156) and Networkers (465/466) and others.
HSTs were equipped with two types of engine and electrical equipment.
Every repeat 80x order also reduces the overall fleet costs and improved productivity at the maintenance depots
The remaining tfw and retired gwr pacers should be sent to Exeter to work Exmouth to Paignton services. This frees up the 150s for use on penzance services and castles to Cornwall to London services. Seems an easy solution.I have sympathy with that view, but 2 weeks is a long way in the future in the context of the current problem.
Even if the crew knowledge, PTI, clearance and safety case issues can be sorted, the major problem remains of what is used to replace the Castles on their current Cardiff-Taunton-Penzance work?
== Doublepost prevention - post automatically merged: ==
One parked in Gloucester barnwood goods loop as wellSuggested on another thread that there's one at Exeter New Yard. No idea if that's correct.
== Doublepost prevention - post automatically merged: ==
Should start to see some trains starting to return to service over the next few days.
All TOCs have met with DFT and Orr today to agree a process for going forward, this will allow units to enter service with the cracks in place but with a process in place to monitor and ensure it is still safe for train to be in service.
Not aware of any process to repair yet.