Bletchleyite
Veteran Member
Most GWR overcrowding was classically Reading commuters, who if they were that bothered would have got a seat on the stopping services.
However that means more cabs full of very expensive equipment and more services with non walk-through sets compared to 'simply' purchasing new intermediate coaches to extend the existing sets.Surely the best solution is for GWR to buy more 5 car units. Then they can near guarantee doubled up units when needed.
Prior to March 2020 that would have led to passengers at the intermediate stations between London and Reading being more likely to have to stand. It isn't just a case of Reading commuters crowding the long distance services - some of the capacity is for them (and passengers travelling west from Reading).Most GWR overcrowding was classically Reading commuters, who if they were that bothered would have got a seat on the stopping services.
It was actually a combination of:Most GWR overcrowding was classically Reading commuters, who if they were that bothered would have got a seat on the stopping services.
I always look back and think maybe it would have been better if the proposal to split GWR devon and cornwall services into its own franchise. Least then you would have has a fleet of 9 car IET for Penzance/Plymouth and a buffet car . At least devon and cornwall would have a greater influence on its franchisee.
Agree, the 5 car order for the wofe route has proved an expensive mistake. The 10s where always going to cost a fortune staffing wise, especially in terms of additional drivers for all the fiddly ecs moves and additional catering staff for each portion. More 5s most definitely isn't the way forward!Sounds very expensive and money the railway doesn’t have at the moment!
Too be fair that still occurs now even with lots of 5 car sets floating about.I have however found my Paddington train at Penzance has been cancelled due to one of the HSTs failing overnight…
Correct. Some new build coaches to extend some 5s is a far cheaper idea both long and short term.However that means more cabs full of very expensive equipment and more services with non walk-through sets compared to 'simply' purchasing new intermediate coaches to extend the existing sets.
Ironically had the Devon and Cornwall franchise been allowed to come to fruition, it would have inherited ONLY 5 car sets and no 9s, so we can probably breathe a sigh of relief that didn't happen!Seems DfT messed up when it ordered so many 5 car units. They should have ordered more 9 cars. Why they thought GWR operated like fast commuter services. Yet LNER got more 9 cars which has worked better. Really doesn't make sense.
I always look back and think maybe it would have been better if the proposal to split GWR devon and cornwall services into its own franchise. Least then you would have has a fleet of 9 car IET for Penzance/Plymouth and a buffet car . At least devon and cornwall would have a greater influence on its franchisee.
Problem with cornish half hourly is people are wised up to catching the faster London trains and not the stopping HSTs. I suspect this is why most of the London trains in the up direction are timetabled to sit at every station for 2 to 3 minutes to attempt to make the journey time to Plymouth on them less attractive.There was only funding for Cornish Half Hourly if the London services were 5 cars in Cornwall (it saved 2 sets overoverall
Why else does it take nearly 2 hours to do pz to ply when it could be done in nearly 1 hr 30????Regarding that point on Penzance to Plymouth being deliberately timed to make them less appealing to the masses, now that sounds way too much like an urban myth!
Why else does it take nearly 2 hours to do pz to ply when it could be done in nearly 1 hr 30????
Why else does it take nearly 2 hours to do pz to ply when it could be done in nearly 1 hr 30????
Yes but the timings are all way to slack, trust me. IF all engines are running the timings will be easily beaten. Even with one engine out the timings can be beaten, and I don't drive overly "hard". Its almost as if they are the same timings from HST 2+8 days. Someone needs to actually come down to Cornwall and see what the IETs are capable of down here, as their abilities are very much being muzzled for some reason.1hr 30 is undeliverable if your schedule is compliant with Network Rail Train Planning Rules (TPR) which mandates things such as Minimum Dwell times and Allowances.
The Up Hind (05.05 ex PNZ) has the least number of stops (misses out St Erth and Cambourne for example), has MINIMUM mandated dwells and no allowances above the minimums and that takes 1hr 43 from Penzance to Plymouth. Add in the St Erth and Cambourne you are back up to around 1hr 50 which isn’t much less than the standard daytime Paddington service.
Perhaps they are the exact same timings. It'd be the easiest thing for management to do. Not saying it's right, of course, Devon and Cornwall deserve better where possible, but I also know how most managers tend to think.Yes but the timings are all way to slack, trust me. IF all engines are running the timings will be easily beaten. Even with one engine out the timings can be beaten, and I don't drive overly "hard". Its almost as if they are the same timings from HST 2+8 days. Someone needs to actually come down to Cornwall and see what the IETs are capable of down here, as their abilities are very much being muzzled for some reason.