MR this month reports improved IET availability on ECML, with it being "some time" since the planned 49 trains have not been available.
That's 25% unavailable! The original contract was for 58 diagrams daily, for which Hitachi built 65 trains.
That explains the retention of the class 91s, and the number of trains reduced to five cars from December.
Does anyone know whether GWML availability is this dire? Or are there any other modern fleets with such low availability after a decade in service?
And do Agility get paid for all 58 diagrams, given LNER have trimmed their service to a level Hitachi can deliver? Presumably Hitachi are insulated from any pain as Agility sit in the middle...
Edit to quote source:
Modern Railways November 2025:
"LNER safety and operations director Warwick Dent Dent... There will be more 5 car Azuma services in the new timetable. Acknowledging the reduction in capacity on the Leeds route...
He also explained that LNER had 49 out of 65 Azumas in traffic each day and this will rise to 50 from the start of the new timetable while there will also be 5 IC225 sets in use. As part of our readiness we monitored the availability of trains and this has not dipped below the December 2025 requirement for some time now."
The original contract was for 58 diagrams (87% availability) in service each day out of 65 trains built.
That's 25% unavailable! The original contract was for 58 diagrams daily, for which Hitachi built 65 trains.
That explains the retention of the class 91s, and the number of trains reduced to five cars from December.
Does anyone know whether GWML availability is this dire? Or are there any other modern fleets with such low availability after a decade in service?
And do Agility get paid for all 58 diagrams, given LNER have trimmed their service to a level Hitachi can deliver? Presumably Hitachi are insulated from any pain as Agility sit in the middle...
Edit to quote source:
Modern Railways November 2025:
"LNER safety and operations director Warwick Dent Dent... There will be more 5 car Azuma services in the new timetable. Acknowledging the reduction in capacity on the Leeds route...
He also explained that LNER had 49 out of 65 Azumas in traffic each day and this will rise to 50 from the start of the new timetable while there will also be 5 IC225 sets in use. As part of our readiness we monitored the availability of trains and this has not dipped below the December 2025 requirement for some time now."
The original contract was for 58 diagrams (87% availability) in service each day out of 65 trains built.