I don't blame you.I'm not posting it again
I don't blame you.I'm not posting it again
And then what goes on XC?
Bi-mode Voyagers would be perfect for XC, so I'm not sure what you'd replace them with?
--- old post above --- --- new post below ---
But what replaces the Voyagers from XC and what replaces the 91s at East Coast?
If Chester - Crewe is wired (which it should be) then the "spare" Voyagers should go directly to XC
What would be old if you converted some 47s to 57s? Just the bodyshell and bogies I expect, everything else would probablly get replaced. Also note that they would only be used on Bristol to Weston-Super-Mare drags and in push-pull sets (replacing 91s) from Swansea to Carmarthen/Pembroke, so not much running round (the only place you might have to install new run-round facilities is Weston-Super-Mare).And how economical is it to have old 57s working these services? And who is going to pay for all the "run round" facilities for these locos? And the extra staff?
They didn't manage it for the Pendolinos/57s, but surely if the dragging is part of the design spec it could be made to work

QUestions now that the high speed new build routes are out with the greece economy
The Intercity 225s are easy, the services they would be running on Great Western (except the Pembroke Docks, because IEP won't fit) would be IEP operated otherwise, so just put those IEPs on East Coast instead.
Exactly, Crewe-Chester wiring and displace all ICWC's 221s with a fleet of extra Pendos. The 221s would become 7-car bi-modes (except the few 4-car ones, which would become 6-car) and the 220s would become 5-car bi-modes. I think the Cotswolds line would take about 14 of the 220s away from XC, but with around twenty (longer) trains coming to XC from ICWC that would still be quite a capacity increase for XC.
The cheaper alternative is to give XC 14 of the IC125s made redundant from Oxford/Bristol/Swansea/Cheltenham electrifications to cascade 14 220s to GW. If you go down that route, put the XC IC125s on Plymouth/Penzance - Edinbrough/Dundee/Aberdeen workings.
What would be old if you converted some 47s to 57s? Just the bodyshell and bogies I expect, everything else would probablly get replaced. Also note that they would only be used on Bristol to Weston-Super-Mare drags and in push-pull sets (replacing 91s) from Swansea to Carmarthen/Pembroke, so not much running round (the only place you might have to install new run-round facilities is Weston-Super-Mare).
It is not a question of not wanting IEPs on my local line, it is a question of:I stil think you're robbing Peter to pay Paul - taking the 91s from the ECML to the GWML so that the ECML gets IEPs because you don't want IEPs on your local line?
Too old for GWML? Don't forget I am a supporter of keeping IC125s on the Taunton/Plymouth/Penzance route until it is electrified, which if it ever happens won't be before 2030, more like the final cut-off date for IC125s of 2035. Also, I'd prefer the option which doesn't involve giving XC more IC125s, ie. wires to Chester and XC getting all the 221s to displace the 14 220s that would be needed for the Cotswolds line if we are going to avoid building diesel LDPE trains.Putting more old HSTs (too old for the GWML) on XC would mean them running even further under the wires (e.g. Glasgow - York)...
I think the SRA and government should be seen to be rewarding which ever option offers the best of
As I understand it, the gauge clearance issue with the mark 4 rakes in Sunderland station is one of height rather than end or centre throw, that requires a class 91 to have its' pantograph tied down in order to pass through due to the low height of the OHLE for the Metro.if you want to eliminate all under-the-wires diesel running on the ECML you are going to have to either spend a huge fortune on Sunderland station or get us some new shorter Multiple Units.
Mark IVs are out of guage there, I hate to think what would happen with 26m vehicles.
if you want to eliminate all under-the-wires diesel running on the ECML you are going to have to either spend a huge fortune on Sunderland station or get us some new shorter Multiple Units.
Mark IVs are out of guage there...
As I understand it, the gauge clearance issue with the mark 4 rakes in Sunderland station is one of height rather than end or centre throw, that requires a class 91 to have its' pantograph tied down in order to pass through due to the low height of the OHLE for the Metro.
Between Park Lane Jn and Greensfield Jn Mk4 + AC Electric locos are permitted diesel hauled for diversionary purposes only with pantographs locked down.
How much would it cost to get Class 57s to be able to push-pull Pendos or similar rolling stock rather than just dragging them? That would seem to solve the problem?
While pure EMUs with loco drags (or a detachable generator feeding the HV bus) makes sense from an energy efficiency perspective I can see problems with service robustness in times of disruption. Hypothetical example: suppose we have set A doing Aberdeen to London and set B doing the reverse. Set A will drop its loco in the platform at Edinburgh and continue on electric, set B will then couple up to the same loco on arrival at Edinburgh and continue on diesel.
When everything is running to time this is great, but suppose set A is running late and when B gets to Edinburgh there is no loco waiting for it. Do we cancel it then and send it back south (in A's path), making everyone change and breaking the connection for passengers coming from further north? Or do we wait in Edinburgh for A to arrive and then do a shunt to swap the loco over, or simply swap the passengers between sets? Is there even the platform capacity to allow this?
The only way round this would be to keep a supply of spare locos at each attach/detach point and spare drivers to do the shunting, but that kind of negates the efficiency savings...