tbtc
Veteran Member
Kings cross to Edinburgh is a long way to drag a diesel engine under every carriage of an IEP
How much would all the diesel weigh (in terms of passengers/ total weight of the train)?
Bear in mind that we have diesel services travelling hundreds of miles under the wires as it is, having a bi-mode train travelling hundreds of miles under the wires but using the electricity seems a step in the right direction.
It's Stuart Baker of the DfT not Norman Baker the minister (although Norman is said to be an IEP supporter now).
Stuart is usually skewered on here as the perpetrator of the IEP design and now its "only supporter".
He used to work for the SRA and was a key player in the WCRM programme, and as an amateur has published a UK rail atlas.
Many more people will have had to sign it off for it to get this far.
Blame Philip Hammond probably, who could have cancelled it but didn't.
It does seem amazing that people think this one man has organised the whole thing - I just wish anyone were that powerful in UK railways (with the exception of Bob Crow)
1 train per day extending to Carmarthen
Nothing further? So it'd be easy to chop this back to Swansea and then every South Wales - London train could be electric?