All the evidence suggests that drags aren't as simple/ cost effective/ reliable as some would like to believe.
QUOTE]
Too right ,its not like its proven technology like hi-speed bi-mode.:roll:
Well 100mph bi-mode trains are extremely well-proven technology in France, so 125mph ones might just be possible, mightn't they?
SJ runs X2000 trains as 2 x 7 car sets at busy periods, more often now the X3000 have come into service. Doesn't bother me I only come to the UK at most once a year but I am amazed at people's willingness to accept poor travelling conditions.
But it sounds as if there is a need for more railways, and before 2026. And the London termini have had their platforms shortened to make them into shopping malls so there is room to put the space back again without building new railways. They could also adjust the ratio of first and second class - SJ sometimes charge less for first class to fill them up, and a bit of tuning of the fares could shift passengers off the high peak. But then again it is easier to assert that "it can't be done"
So you come to the UK once a year, but you have an MP asking questions on your behalf. Does this MP know where you live?
The last time you started on about London stations, I pointed out that the additional circulation area at Paddington had made the station a far more passenger-friendly environment. Remove it and you have ever-growing numbers of people in a cramped space. Or are cramped stations better than the cramped trains we apparently have to suffer?
SJ sometimes charge less for first class to fill them up
Do they? Would that be like discounted first class advance fares offered by several UK operators? I think it might...
On more general points, a number of people keep going on about dragging diesel engines around under the wires. If you had diesel locos working on the Cotswold Line, could someone please explain how they are going to get to a servicing depot for the regular heavy maintenance that such a punishing duty would require (stops and starts every seven minutes or so most of the way), if not by running for miles under the wires? The nearest GW depot with loco servicing facilities is Old Oak Common, 60 miles from Oxford. LM has fuel at Worcester but there are no heavy maintenance facilities. Any locos working Swindon-Cheltenham would presumably have to travel to and from Bristol to get some tlc and fuel, so again miles of light engine running under wires.
I have yet to see anyone come up with a credible figure for the 'few' locos that would be needed to cover the Cotswold Line, with an hourly off-peak frequency, stepping up to half-hourly in the peaks and where trains turn back at four different stations across the course of the day at present, meaning it is not some neat, regular sequence of out and back trips on the same run all day.
There has also been discussion of interiors and train lengths. The GW franchise invitation to tender made clear that DafT was prepared to listen to proposed variations on its plans. The IEP seat layouts linked to back up the thread are indicative schemes, nothing more.
No-one from DafT has ever explained how you could operate 2x5-car IEPs on peak Cotswold Line trains, with all the short platforms, suggesting that some sort of longer bi-mode would be an inevitable requirement. FGW md Mark Hopwood has spoken recently about the 180s often being near-full now on some off-peak Cotswold trains west of Oxford, and wondered how you accommodate future growth if the next generation of trains only has five coaches, with not many extra seats? I suspect the other bidders for the GW franchise may be thinking along similar lines.