anti-pacer
Established Member
I'm not in the know, so just wondered what's happening regarding IEP on the ECML.
Is it going ahead and if so, when? Also, what does it involve?
Is it going ahead and if so, when? Also, what does it involve?
Firstly: I think your answer here: https://www.gov.uk/government/policies/expanding-and-improving-the-rail-network
I don't know why they don't just start upgrading the ECML to High Speed (I mean very high speed), and forget IEP.
It would make more sense than building a new railway line going all the way to Leeds, I am rather of the opinion with HS2, yes they need a new line to increase capacity between London and Birmingham, but to build new line beyond is senseless.
East Coast IEP is conditional on a number of things, including the success of the pre-series and GWML examples.
they need a new line to increase capacity between London and Birmingham, but to build new line beyond is senseless.
Really, I think what is needed from new lines is capacity more than speed, though I would like to see IC225s doing 140mph in service. A new line starting between the MML and ECML, then shifting to the left a bit and calling at Nottingham, Sheffield and Leeds would seem on the face of it a more sensible option for linking Leeds to London than via the outskirts of Birmingham.Personally though, I don't know why they don't just start upgrading the ECML to High Speed (I mean very high speed), and forget IEP.
It would make more sense than building a new railway line going all the way to Leeds, I am rather of the opinion with HS2, yes they need a new line to increase capacity between London and Birmingham, but to build new line beyond is senseless.
But they're not doing that...As for HS2, I personally think ending the line north from London at Birmingham is senseless.
A new line starting between the MML and ECML, then shifting to the left a bit and calling at Nottingham, Sheffield and Leeds would seem on the face of it a more sensible option for linking Leeds to London than via the outskirts of Birmingham.
As for HS2, I personally think ending the line north from London at Birmingham is senseless. If they are to do that, they should only build it for 125-150mph (which means you can curve around sensitive areas more easily). You don't need to do 200mph to beat a motorway, why use more energy to go faster than 125/140/150 if you don't need to? On longer distances where aviation is a competitor then high speed (still, 186mph like Eurostar should be plenty with so few stations).
I'm not in the know, so just wondered what's happening regarding IEP on the ECML.
Is it going ahead and if so, when? Also, what does it involve?
Why don't they build an IEP prototype instead of waiting for pre-series and production units to see if it works?
The project has been on the DfT's drawing board for 6 years now - surely they could have built a prototype in that time because it took 2 years for an HST prototype and 4 years for an APT prototype to be built.
They haven't even built a wooden cab/saloon mock up yet either, all we've seen are computer animations. :roll:
I would assume there was never the idea to just end it at Birmingham, because other than it providing a short-term economic/social/political boost there's no real benefit to building new rather than expanding what we have.
Most of the HST improvement options are pushed only by people who own HST sets, and thus have the most to lose from them being replaced.
They don't really make very much sense for anyone else to support.
Do they not? Depends how good the job is. Both Chiltern and FGW seem to think the HSTs can go on for a while yet, and at present it is only the Mk3s that really need something doing to them. The power cars are apparently quite fine as they are.
So perhaps the plans arent that far fetched.
Can class 43s be regeared to a lower top speed? Would a 100mph class 43 with 5 or 6 coaches and a DVT be useful? Something like that might not go amiss on ATW's busier Manchester services, though I suppose there are 67s for that so really all that's needed for that are the mrk3s from the IC125s I guess. Alternatively, somebody could buy some new 125mph electric locos, there's already talk of buying some to replace 91s, why not to suplement them instead?THe power cars aren't electric and thus for the majority of the HST fleet will be worthless pretty soon.
FGW needs msot of its fleet to be bi-mode or electric, EC likewise and Chiltern don't even have a route where HST sets would prove useful.
The Mark 3s might be able to go "on for a while yet" but they almost certainly will not go on for long enough to cover the reconstruction they need and the purchase of new power units required to propel them either on bi-mode or pure electric power.
If they could be converted to electric trainsets using existing resources you might be able to do something but we need 125mph trains and there are no spare 125mph electric locomotives.
Once you add in the cost of the locomotives that will then be surplus to requirements ten years after they arrive once the Mark 3s go to the scrapline, you come out more expensive than simply ordering new multiple units.
I doubt the "new locomotive" plan for EC or GA will ever go ahead, the modifications to the 91s will win in the former case and some sort of AC Cl444-alike will likely win in the latter case.
I doubt you are right on the GA front, the Norwich line requires an intercity set with on board catering. Plus you try telling out Norwich commuters that they can't have their intercity sets and more and they need to put up with a multiple unit. It would not go down well!! The hauled sets will be around for a while longer on GEML.
Class 444s have the same provision for on board catering (the TSRMB is a Modular Restaurant fitted vehicle) as the Mark 3 formations on GA, which certainly don't need a full buffet vehicle considering the offer they have now.
There is no reason similar units could not take over from the Class 90+Mark 3 formations.
But they are only 5 car units. What's the point in having 2 x 5 car multiple units with wasted space of the middle cabs. You might as well have a proper intercity formation.
With regards to the catering like I said before you try telling the Norwich commuters that they don't need a full buffet car.
THe power cars aren't electric and thus for the majority of the HST fleet will be worthless pretty soon.
FGW needs msot of its fleet to be bi-mode or electric, EC likewise and Chiltern don't even have a route where HST sets would prove useful.
The Mark 3s might be able to go "on for a while yet" but they almost certainly will not go on for long enough to cover the reconstruction they need and the purchase of new power units required to propel them either on bi-mode or pure electric power.
If they could be converted to electric trainsets using existing resources you might be able to do something but we need 125mph trains and there are no spare 125mph electric locomotives.
A proper intercity formation might save the wasted space of the middle cabs, but the current sets throw away 36m of platform space with the engine and DVT which would not be wasted in a multiple unit formation.
Additionally in off peak periods the service could run with only five cars in the consist, allowing more services to be run without worrying about sets being in for maintenance of whatever.
As far as I can tell, the catering offer on GA is inferior to Hull Trains, which has a Modular Restaurant type settup on the Class 180s.
What's so special about Norwich commuters?Again listen to the outcry from the Norwich commuters if that happened.
Have you ever seen the intercity sets in the off peak?? There is no way 5 car units would be enough capacity in the off peak. They need to be full length all day! Also if you had 2 units you would be splitting first class so you would need to provide 2 lots of catering. Again listen to the outcry from the Norwich commuters if that happened.