Nym
Established Member
You proberbly would if 222s where running the route too, it is likely that these would be re-formed and 'electrodieselificated' ie. Two panto/transformer cars added.
Underfloor engines all the way from London to Penzance?! No thanks! At least with an IEP you'd have the choice of sitting in an unpowered coach.
Underfloor engines all the way from London to Penzance?! No thanks! At least with an IEP you'd have the choice of sitting in an unpowered coach.
At this point your alternative is an IEP to Plymouth and then a Sprinter/Turbostar to Penzance.
with underfloor engines! Id rather have a meridian throughout to Penzance with a restaurant/pullman/travelling chef!
I think this could be the way with Cornwall servives and Plymouth services after Midland Mainline Electrification, with panto cars.
Would make a lot of sense
I think so. What about the Carmarthen and Herefords itd make sense on those as well. But their SDO would need commissioning.
Both of those services are ones that are specifically earmarked for operation by Bi-mode IEP trains (Presuming that the Carmarthen service is retained in the new franchise).I think it is more likely that First or whoever is running the trains on the GWML would be running the Carmarthen and Hereford services with Class 180's and possible Hybrid IEP's if there is enough sufficient. Otherwise, it will be HST's and Class 180's.
Both of those services are ones that are specifically earmarked for operation by Bi-mode IEP trains (Presuming that the Carmarthen service is retained in the new franchise).
The Section 54 Agreement covering the lease of the five class 180s runs out at the end of 2016, and with Great Western planned to start receiving IEPs in the first half of 2017 I would be surprised if the franchisee saw fit to renew the contract when the 180s represent a small non-standard fleet that would incur additional leasing costs, when enough new trains to cover GWs long distance service are already being ordered.
True, but don't forget this is DaFT who would probably be negotiating this contracts......![]()
But keep anything from the Voyager/Meridian family far far away from GW territory thanks. Liverpool-Norwich would be my suggestion, another route that will have bits wired and others not.
The order covers bi-modes for Cotswold line services to Worcester, Malvern and Hereford and was always going to once the idea of a diesel IEP was ditched.
180s can't cope with the loadings on the peak trains to/from Hereford, which is why they have never been used on them. HSTs have been a permanent fixture on the two Hereford runs since BR days and are now needed on the rest of the peak services as well.
But keep anything from the Voyager/Meridian family far far away from GW territory thanks. Liverpool-Norwich would be my suggestion, another route that will have bits wired and others not.
It might be an idea, to keep back enough HST's to cover the peak time services on the Cotswold line as a stop gap measure, even if it means under the wire running to oxford?
This could be commonplace until longer more suitable stock can be found, but I suspect they will be stuck with 5 car IEP bi-modes in the peaks as well
I don't think so - you don't remove 500-seat trains and tell your passengers tough, we can only get 350 of you on board now
Are you suggesting that a five coach IEP could only hold 350 passengers?
There's an extra three meters of length on each coach (compared ot a 23m HST coach)
Depends on seating arrangements and how much space is taken up by the buffet (if there is one) and the cabs. Allowing for DSO-TSO-TSO-RSB-DF, 350 passengers sounds about right.
From http://www.agilitytrains.com/assets/pdf/AT-090205-Key_Facts-Released-1_5.pdf
Therefore, while the details below meet the requirements of the train technical specification for the six different bid scenarios, the train operating companies may choose to make changes to the internal characteristics of the trains that are finally delivered:
Total Seating capacity
10-Elec-IC Type 5 649
10-Bi-IC Type 2 610
10-Self-IC Type 1A 552
10-Self-IU Type 1B 581
5-Elec-Co Type 3 351
5-Bi-Co Type 4 289
Elec = Electric, Bi = Bi-mode, Self = Self-power. IC = Intercity, IU = Interurban, Co = Commuter
Although take the Bi-mode numbers with a large pinch of salt as the diagrams show Hybrid Enginees in the end vehicle, rather than under floor engines.
I don't have the original PDF release that you are referring to, however I did copy most of the details that were contained within it into a word document. The seating capacities and train formations that you are looking for are as follows:How did you get this archive PDF? I spent hours last night trying to find another PDF from Agility. It was released after the review in 2011 when the goverment confirmed they were proceeding. Showing seating formations of both a 8 car electric, 8 car bi-mode and a 5 car bi-mode SET. I would of saved it on my old mac, that left me in March. So the seating formation PDF was before then.
Would be brilliant if someone has it, or knows how to look at archive versions of the Agility site?
It would of updated the PDF you have linked, as it was after underfloor engines were decided on and the doors/vestible areas were switched around. All i remember there were more table seats then the 4 now offered on FGW HSTs and they lined with windows![]()
So the 5-car Intercity sets are expected to have a total of 309 seats, 59 of which are first class.Formation
Five Car
1. DPTS, 60 seats standard
2. MeS, 88 seats standard
3. M(e)S, 64 seats standard, catering
4. M(e)C, 30 seats first, 38 seats standard
5. DPTF, 29 seats first, disabled toilet
Eight Car
1. DPTS, 48 seats standard, disabled toilet
2. M(e)S, 88 seats standard
3. MES, 88 seats standard
4. TS, 72 seats standard, cafe bar
5. TS, 88 seats standard
6. M(e)C, 30 seats first, 38 seats standard
7. M(e)F, 56 seats first
8. DPTF, 20 seats first, kitchen
D- Driving Car, P- pantograph, T- trailer car, M- motor car, e- diesel engine, (e)- diesel engine in bi-mode version, S- standard class, C- standard and first class, F- First class.
I don't have the original PDF release that you are referring to, however I did copy most of the details that were contained within it into a word document. The seating capacities and train formations that you are looking for are as follows:
So the 5-car Intercity sets are expected to have a total of 309 seats, 59 of which are first class.
It also seems a bit strange that first class passengers have to pass through one or two second class coaches to reach the buffet. A bit of rearranging to put it in the composite coach, thus making it an RFB, might make more sense, although only taking out 24 seats makes it seem a bit small. HST RSBs take up about the same space as 40 seats.
How did you get this archive PDF?
Sorry if these have been discussed, but I've read through this and the GWML bi-mode post, and can't see the answers.
1) What are the 13x 5 car bi-modes going to East Coast being used for ?? The 13x 9 car bi-mode are presumably replacing the 15x HSTs. Are these 5 car bi-modes intended for the same services but smaller/increased frequency ala Op Princess which seems to be the concept for GW 5 car bi-modes, or for something else ?
2) there are 12x 5 car electrics. I understand these will take over the fast services on the Gt Northern run by 365s, presumably releasing a similar number of those. What then ?, are they being cascaded elsewhere, or might that allow the 321s on the Gt Northern to be cascaded?
3) franchising. Presumably many/most of the non-Thamslink Gt Northern services currently within Capital Connect will transfer to East Coast?, taking the 365/321s with them ? and 317s?
as well as the 40 365s, 12 317s and 13 321s on the GN side. However, ECML suburbans diverted via Thameslink will not include Kings Lynn-Cambridge-Kings Cross expresses, which will transfer to the new East Coast franchise and almost certainly be taken over by new 5-car electric IEPs.