It has been known since 2006 and indeed may have been a large reason FGW got the franchise to start with.
It would most likely not stop at all the places HSTs currently do.Does anyone on here with atechnical knowledge believe for one second that IEP with no increase in speed but just by acceleration alone, will cut 20 minutes off a journey to Bristol?!! A 91 versus and HST over 400miles can only achieve about 10minutes can't it? Or maybe a touch more so where did that figure come from???
They won't be removing them. The service to Bristol Temple Meads is increasing to 4 tph so the current 2 tph at Chippenham will be retained.I thought the reason journeys have slowed is because it became commercially required to stop at odd places like Chippenham and Didcot on most services? Could they really remove these?
But the same goes for Tiverton Parkway and Totnes as I said in the other thread. Poeple will argue that if the train is picking passengers up, even if they are only going to Bath or Swindon then the stop is justified. Of course had the SRA not axed the direct Brsitol to Oxford service then you'd have an additional service for Chippenham and could also reopen Corsham station.Could they not do away with 1 of those Chippenham services as it is? It's hardly a hub and it's general area is connected with bath anyway. It doesn't seem worthy of 2 trains per hour with an Intercity but that's just my view. Seems a good way to slow things down un-necessarily to me.
Wow!. . . . could also reopen Corsham station.
It could be argued that Virgin should stop everything at Milton Keynes but this is not the case.I can't see Raeding ever not being part of a stopping pattern but I'd love to be proved wrong.
I can't see Reading ever not being part of a stopping pattern but I'd love to be proved wrong. Commercially Reading is London's high-tech home spreading from there to Weybridge. Can't see how it would not be included. As I say I'd love to be proved wrong, in all honesty I'd prefer Swindon was removed!
I believe the Cathedrals Express, that went the way of almost every other service at the start of the new franchise with Reading calls added.Not sure if it still operates, but there was definitely one service each way daily between Oxford & Paddington that didn't stop at Reading.
It could be argued that Virgin should stop everything at Milton Keynes but this into the case.
It could be argued that Virgin should stop everything at Milton Keynes but this into the case.
All depends if Virgin will want to keep the headline journey times to try and compete with HS2.It'll become semi-fast like those on the continent I believe. Will serve major towns and connect them with the major cities rather than major city to city services with few stops. Sure Milton Keynes will be one of those almost certainly.
In July 2009 with the original electrification announcement, it said work on the electrification would begin immediately. That of course didn't happen. So let's hope now it's not long before the actual physical evidence of work on the electrification going ahead.
From a presentation by Matthew Gorton of FGW to TravelWatch SouthWest on 5th March 2011 at Taunton.
Electrification
London to Newbury
London to Oxford via Didcot
London to Bristol Temple Meads via Chippenham / Bath
London to Bristol Temple Meads via Bristol Parkway
London to Cardiff via Bristol Parkway and Newport
This is seen as a first phase, with a rolling onward program if a case can be made.
Swansea is not included; it does not make the case at the lower service level that's the most that's currently justified, and there is no extra speed gain from electifying this twisty section on its current track routing
South Wales valleys are possibly in - next stage of electification - in the next control phase (i.e. 2014 - 2019).
InterCity Express Program (IEP)
2016 for initial delivery.
Hitachi to provide 533 vehicles for daily use of which 308 will be on GW; note that more will be built to provide for those being serviced by Hitachi, etc
To be formed into 8 car electric sets and 5 car bimode sets
Ratio (of vehicles?) electic : bimode to be 40 : 60
Bimode sets capable of coupling to make up 10 car sets for busy services
All vehicles will be passenger carrying
Vehicles will be 26 metres long
Bimode sets will have engines under 3 of the 5 carriages
Design is to allow for easy lengthening / shortening of the sets
Service futures (GW)
4 trains per hour, London to Bristol Parkway (1 hr 11 mins)
- 2 carry on to Cardiff (1 hr 42 mins), of which 1 carries on to Swansea (2 hrs 39 mins)
- other 2 carry on to Temple Meads
2 trains per hour, London to Bristol Temple Meads via Chippenham / Bath
Core peak services from London to Hereford/Worcester, Swansea, Exeter, Cheltenham and Oxford, plus "perhaps some beyond". Carmarthen was mentioned, as was Taunton (which I guess is via Bridgwater).
This is said to be an extra 8500 peak seats - an increase of 30%
West of England is "future phase". No mention made of Weston-super-mare.
The HST fleet, refurbished by FGW for a life to 2013, will be extended to 2016 for the whole fleet with a longer extended life for a smaller fleet for West of England services, pending cascade of other trains from elsewhere in the UK or further new builds.
Questions asked
"First has the option to carry on to 2016 or to complete the franchise in 2013. Can you tell us if a decision has been made yet?" - "No decision made"
"You talk about the government, Hitachi and the operators having inputs into the deisgn of the new trains. Will passengers have an input on the interior design". Real anger was expressed by the questioner on high, hard seats, lack of tables, and very close airline style seating. - "Yes - passenger inputs will be taken from Passenger Focus and operator inputs from ATOC. We have not seen details yet but bear in mind that safety is paramount and you'll note that modern interior design is very much safer - see Lambrigg accident, for example, with limited casualtys from a high speed accident"
"Redoubling via Kemble - part of the scheme?" - "No, but the usefulness of doing so is recognised." [I think there was comment about further announcement in next 10 days]
"Exeter / Plymouth, and cascading of HSTs" - "Exeter will be 2 trains per hour bimode, Plymouth hourly HST beyond". The questioner asked about using HSTs for the stoppers on the Cornwall main line and also Cardiff - Portsmouth, but I didn't catch any answer given to those points
"What about Torbay" - "Torbay is important to us as witnessed by the extra service introduced recently" I didn't catch any further answer telling us about service patterns for Torbay under IEP / re-allocated HSTs.
..in all honesty I'd prefer Swindon was removed!
Why not, the lines at Basingstoke are 3rd rail.Zoe said:I'm not sure you'd be able to electrify Reading to Basingstoke as third rail. Only extensions of existing systems are allowed and I'm not sure if Basingstoke to Reading could count as that.
Why would they want to electrify a freight only line anyway? Has it previously been used for diversions?When it says electrify to Newbury, does that include the few extra miles to Bedwyn? Otherwise I guess this service may find itself reduced to a Newbury shuttle, rather than run a DMU all the way to London 99% under the wires...
And also on the subject of trains stopping at Reading, isn't there some archaic rule or regulation that says all passenger services have to stop there? Or is that no longer the case?
p.s. if they are thinking about the Severn Beach line for electrification, thats good, but I would assume they would also want to also wire back from St. Andrews Road to Bristol Parkway... which begs the question... how will they get past this...
http://maps.google.co.uk/maps?f=q&s...1.517439,-2.578408&spn=0.001793,0.004823&z=18
You might be the first, but you certainly won't be the last. And with good reason.Can I be the first to complain that the windows on the IEP won't line up with seats?