With two joined five car sets would it not be possible to stop them so that 2 or 3 coaches of each set are in the platform and use selective opening (jointly by the guard and driver?) with closing and dispatch by the guard based in the second set).
Or is that sort of thing too obvious and not workable (and if not why not).
Well let's hope so - it would solve the issue in most cases but if this is the way they are thinking, then there are some platforms all over the parts of the GW area projected for IEP operations where extensions would clearly be needed to get at least a couple of coaches of both sets on, so entry and exit doesn't take forever. And even then certain people here will still go off on one again about there not being through corridors between sets, catering, revenue protection....
I suspect the problem is stations like Hanbrough which only take 2 coaches at the moment. You would need to be able to stop with E and F in the platform, assuming door location. Plus Hanbrough in the morning always has a ton of people with bikes.
Jimm - thus far your posts are the only comments anywhere I've seen that have said that there can (and will be) alternative formations of Bi-mode.
My comment would be this - if there is a 'special set' of 'peak formation' bi-mode IEP for the cotswold line and other services, what happens to them between peaks. There are perhaps 6 morning and 8 evening services that need to be 8+. You'd have to be super careful with rostering to ensure that you have i) enough sets and ii) they are in the right place for the peaks. What you do with the 8+ bi modes between peaks? Run them to Great Malvern?
Please don't put words in my mouth. I have never said there will be.
But there could be, even though you seem to imply I'm making it up. I'm not - the stuff about the potential for variations of formations is here in black and white in the GW invitation to tender on page 77
https://www.gov.uk/government/uploa...hment_data/file/3596/invitation-to-tender.pdf
It's not there by accident, the pre-qualification clearly threw up concern from potential bidders about the proposed fleet, which is why DfT put it in there.
What happens to any longer sets between the peaks? You could run them up and down where loadings are heavier, such as between London and Oxford on services that don't extend to the Cotswold Line, or London to Bristol or Cardiff - just like some of the HSTs do now between the peaks. Diagrams are not captive to the Cotswold Line, if that's what you think, and the trains have to get back to a depot at some point, so can just as easily go during the day. Four HSTs currently spend the night parked at Worcester and Hereford, not at depots.
I didn't completly ignore it this time, qualifying my first statement with: "(admittedly from some time ago but we don't know if DfT have really seen sense or not)". However, as seen
here, near the bottom my fears that DaFT might not be listening to FirstGW's comments that 5-car is wrong have been confirmed since yesterday Hitachi were still reporting that the order for GW is 5-car bi-modes and 9-car 'electrics'.
But if you're running a 10-car train through to Hereford anyway you might as well have longer sets to begin with, avoiding the need for all the complicated stuff and crumple-zones half way through the train, and giving you full buffet facilities.
It confirms nothing at all - I believe the speaker you mean was the boss of Hitachi Europe (as the site linked to is down) - and the order Agility Trains currently has from the DfT says that is what they are required to build, so he isn't going to say anything different. He can't, as there is no new franchisee to look at the issue and FGW, who will likely have to try to sort it out now, are still not in a position to do so as they and DfT are still in talks on a three-year agreement.
The GW invitation to tender made clear that things could change and that remains the case. Do not think for one moment that FGW are going to sit there and say 'we could lose the keys shortly, so we won't worry what these trains end up like' - FGW do take a long-term view and will act accordingly on IEP if they are in a position to do so. They aren't going to saddle themselves or any other future operator with a pup if they think that is what the proposed fleet will be.
And what was I saying above about what people would say about the catering provision? There is no actual need to run a 10-car train to Hereford, same as there's no need to run a full-length HST set there now, were they not fixed formations. If it has to be 2x5-car, then in the peaks you would probably run a pair east of Worcester and join or split the train there.
And the question about all GW bi-modes being five-car formations is still there, given current loadings on five-car 180s on some services west of Oxford, the limited extra capacity a five-car IEP would have beyond what a 180 offers, and the growth trends in passenger traffic - all factors very much in the minds of people at FGW.